Similar Projects
ComEd Vault Ventilation (Construction)
Infrastructure
Design
$100,000 to $250,000 est. value
Chicago, IL 60612

Boiler Replacement at Payson Elementary School
Renovation
Sub-Bidding
$300,000 CJ est. value
Payson, IL 62360

Replacement of the Learning Resource Center Network Room Air Conditioner
Renovation
Sub-Bidding
$310,000 CJ est. value
Mattoon, IL 61938

Hail Damaged HVAC Equipment Replacement
Infrastructure
Post-Bid
Urbana, IL 61802

Central Community Center - RTU Replacement (Units 6, 8, 11)
Alteration
Post-Bid
Mount Prospect, IL 60056

Y1da--537-18-142 Replace Failed S10c AHU for Vascular, SCM, and Urology Construction
Results
$1,000,000 to $2,000,000 est. value
Chicago, IL 60612

Des Plaines HVAC Improvements
Results
Des Plaines, IL

Weatherization (IHWAP) Program
Term Contract
Post-Bid

J041--*SPECIAL* Hines and Joliet Critical Cooling Repairs
Results
Hines, IL 60141

HVAC Replacement and Toilet Room Remodeling
Renovation, Alteration
Post-Bid
Norridge, IL 60706

HVAC Replacement Arlington Heights Memorial Library
Results
Arlington Heights, IL

HVAC Roofing Plumbing Sewer Electrical
Infrastructure
Post-Bid
Cicero, IL

Replace Split System Condensing Unit at Pace Northwest Division
Results
Arlington Heights, IL

HVAC Cooling Systems
Alteration
Post-Bid
Riverdale, IL

J041--Repairs need to HVAC System(578)
Term Contract
Results
Hines, IL

Last Updated 02/13/2023 09:43 AM
Project Title

Ledgewood School and Stone Creek School 2023 HVAC Improvement project

Physical Address View project details and contacts
City, State (County) Roscoe, IL 61073   (Winnebago County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $776,900 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

**As of December 20, 2022, this project has been awarded to Northwest Contractors Inc., but award amount not available. The removal of existing HVAC equipment for replacement with packaged rooftop units and associated electrical work, other miscellaneous mechanical improvements, coordination of roof patching with Owner's separate contractor, and interior finish work associated with new mechanical systems for its Ledgewood School (11685 S. Gate Rd, Roscoe, IL) and Stone Creek School (11633 S. Gate Rd, Roscoe, IL). American Reprographics Company , 640 North LaSalle Street, Suite 240, Chicago, Illinois, will have complete sets of the Bidding Documents to prospective bidders and subcontractors available for download through their Public Planroom under the "Print Center" link on their homepage. Submit with each bid, a certified check or acceptable bidder's bond payable to Kinnikinnick CCSD No. 131 in an amount equal to ten percent (10%) of the total bid. The successful bidder will be required to furnish satisfactory Labor and Material Payment Bond, and Performance Bond. The successful bidder is required to pay the general prevailing wage for work as ascertained by the Illinois Department of Labor, and shall submit certified payroll records, in compliance with the Prevailing Wage Act (820 ILCS 130) and shall comply with all applicable Illinois statutory requirements regarding labor, including Equal Employment Opportunity laws. Bids may not be withdrawn within thirty (30) days after the scheduled time of opening bids, without the consent of the Owner. The Owner reserves the right to accept any bid or to reject any or all bids, or parts of such bids, and waive informalities or irregularities in bidding. The Owner requires Substantial Completion of the project on or before August 4, 2023.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents