Similar Projects
The Edge at Davie
New Construction, Build-Out, Demolition - 1,210,110 SF
Conception
$10,000,000 CJ est. value
Davie, FL 33314

Oakland Park Development
New Construction, Build-Out - 327,467 SF
Conception
$148,600,000 est. value
Oakland Park, FL 33334

909 Sistrunk
New Construction, Build-Out - 74,095 SF
Design
$16,580,000 est. value
Fort Lauderdale, FL 33311

Hollywood Boulevard Mixed Use
New Construction, Infrastructure - 290,712 SF
Design
$22,000,000 CJ est. value
Hollywood, FL 33020

SW 10th Street Connector Transportation Systems Management and Operations
Infrastructure
Bidding
$36,170,926 CJ est. value
Deerfield Beach, FL 33442

Regional Park Recreational Trail Project
Infrastructure
Bidding
$700,000 CJ est. value
Miramar, FL 33027

Holiday Inn FTL / Fort Lauderdale
New Construction, Infrastructure
Post-Bid
$10,200,000 CJ est. value
Fort Lauderdale, FL 33316

Holiday Inn FTL / Fort Lauderdale
New Construction, Infrastructure
Post-Bid
$10,200,000 CJ est. value
Fort Lauderdale, FL 33316

Hollywood Hills ES - SMART Program Renovations
Renovation, Infrastructure
Results
$5,750,000 CJ est. value
Hollywood, FL 33021

Honey Hill Drive Off-Site Improvements Project
Results
$165,000 est. value
Miramar, FL 33027

Block 40 Tower
New Construction, Build-Out - 551,688 SF
Construction
$70,000,000 est. value
Hollywood, FL 33020

Unifirst - Pompano Beach
New Construction, Addition - 9,056 SF
Construction
$1,200,000 est. value
Pompano Beach, FL 33069

Homewood Suites by Hilton
New Construction, Infrastructure - 105,747 SF
Pending Verification
$10,000,000 CJ est. value
Fort Lauderdale, FL 33308

Funston Apartments
New Construction, Infrastructure
Pending Verification
$6,000,000 CJ est. value
Hollywood, FL 33020

Davie Rodeo Residential Building
New Construction, Build-Out - 1,500 SF
Conception
$79,400,000 est. value
Davie, FL 33314

Last Updated 09/21/2022 04:48 PM
Project Title

New Police Headquarters

Physical Address View project details and contacts
City, State (County) Fort Lauderdale, FL 33312   (Broward County)
Category(s) Government/Public, Green Building, Heavy and Highway
Sub-Category(s) Fire/Police Station, LEED Certified, Parking Garage, Site Development
Contracting Method Construction Management - CM at Risk, Competitive Bids
Project Status Request for Qualifications, Design Development, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $78,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

*As of June 27, 2022, a construction manager has been awarded, and project is in design development. Subcontractor bidding may be scheduled sometime in May of 2022. Construction could start sometime in the 4th Quarter of this year, 2022. The City of Fort Lauderdale, FL (City) is actively seeking a qualified, experienced, and licensed firm to provide Construction Management at Risk (CMAR) Services for the construction of a new Police headquarters for the City of Fort Lauderdale as further described in Section III - Scope of Services

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Panel Doors, Multi-Leaf Vertical Lift Doors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Acoustic Treatment, Painting, High-Performance Coatings.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Wardrobe and Closet Specialties, Flagpoles, Flags and Banners.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Unit Kitchens.
Division 12 - Furnishings, Countertops, Rugs and Mats.
Division 14 - Conveying Equipment, Slide Pole Systems, Firehouse Slide Poles.
Division 21 - Fire Suppression, Facility Fire-Suppression Water-Service Piping, Fire-Department Connections, Fire Pumps.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Emergency Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Call Management, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents