Similar Projects
Replacement of Boiler and Water Heater at the MAC Building
Alteration
Post-Bid
Little Rock, AR 72201

Replace Radiant Heaters - B140
Term Contract
Post-Bid
$25,000 to $100,000 est. value
Jacksonville, AR 72076

HVAC and WH Upgrades
Results
Jacksonville, AR

W041--Chiller Rental
Term Contract
Results

Academics Plus Maumelle Charter HVAC Ionization Upgrades
Renovation
Post-Bid
Maumelle, AR 72113

Emergency Roof and HVAC- 1116 West 34th Street
Alteration
Results
$8,500 est. value
Little Rock, AR 72206

Inspection of and Recommendation of Rehabilitation/Upgrades to HVAC Units and Installation of Air Purification Systems
Alteration
Post-Bid
North Little Rock, AR

Emergency HVAC
Term Contract
Results
Little Rock, AR 72202

Maintenance, Repair and Installation for HVAC Service
Term Contract
Post-Bid
Little Rock, AR

Emergency HVAC
Term Contract
Results
$3,000 est. value
Little Rock, AR 72209

Remediate Fan Coils
Term Contract
Post-Bid
Jacksonville, AR 72078

Emergency Roof and HVAC
Term Contract
Results
Little Rock, AR 72204

Remove Old and Install New HVAC Units
Alteration
Post-Bid
Little Rock, AR

Emergency Roof and HVAC
Term Contract
Results
Little Rock, AR 72206

Arena HVAC Renovation Project
Alteration
Post-Bid
Little Rock, AR

Last Updated 08/23/2022 07:32 AM
Project Title

Lake Maumelle Generator Cooling Water Replacement Project

Physical Address View project details and contacts
City, State (County) Roland, AR 72135   (Pulaski County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $75,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

For the following Scope of Work: Lake Maumelle Generator Cooling Water Replacement Project Central Arkansas Water Board of Commission reserves the right to reject any or all bids. CAW is an equal opportunity supporter committed to outreach and diversity. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. SCOPE OF WORK Central Arkansas Water is taking bids to replace the existing generator steel cooling water piping. Cooling water piping consisting of generator building intake and discharge lines supply lines to three circulating pumps. From circulating pumps discharge to two heat exchangers intake/discharge connection. From heat exchanger connection to generator engine block connection. Below is approximate list of material needed to complete project. Before submitting a bid on the project, the contractor must coordinate to meet on site with CAW maintenance supervisor to determine all material and labor required to complete the job in whole. The job to be completed in 30 days of start date. Start date 10/10/2022. Approximate Material List 126 ft. 8" schedule 40 steel pipe 9- 8" 90s 14-8" tees 6- 8" 45s 10- 8" flanges 1 - 8" blind flange 200 ft. 6" schedule 40 steel pipe 26- 6" 90 elbows 10- 6" 45 elbows 42- 6" sch 80 flanges 10- 6" X 3" Concentric reducers 20- assorted thread-o-lets Bolt and gaskets sets for all flanges

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents