Similar Projects
Replace HVAC Units Building 7050
Design
$500,000 to $1,000,000 est. value
Fort Hood, TX

Kitchen Hood Service
Post-Bid
Fort Hood, TX

J--Furnish and Install New Metasys Bas Tec Programmable Controllers 674-20-1-5065-0110
Post-Bid
Temple, TX 76504

Replace Two Chiller Circuites for a Building
Results
$250,000 to $500,000 est. value
Killeen, TX 76544

Replace HVAC at Building
Results
$500,000 to $1,000,000 est. value
Fort Hood, TX 76544

41--JMITS Test Van Air Conditioner Replacement Units
Post-Bid
Fort Hood, TX

41--CTX Mobile Chiller Unit
Results
Temple, TX 76504

HVAC Services, Supplies and Equipment
Post-Bid
$50,000 to $150,000 est. value
Belton, TX 76513

Replace Chillers Building 56059
Results
$100,000 to $250,000 est. value
Fort Hood, TX 76544

Installation of Bathroom Ventilation Fans at Belton Housing Authority
Post-Bid
Belton, TX 76513

J041--New-Temple AHU 7 CHW Pump & Bypass (VA-19-00102647)
Results
Temple, TX 76504

6515--Nucmed Fume Hood
Post-Bid
Temple, TX

Replace HVAC Systems Building 70020
Results
$500,000 to $1,000,000 est. value
Fort Hood, TX 76544

Suppliers of Daikin/Mcquay HVAC Chiller Units
Post-Bid
Fort Hood, TX

Replace Chillers in Building 56055
Results
$100,000 to $250,000 est. value
Fort Hood, TX 76544

Reported 04/22/2020 12:00 AM
Project Title

4510--Cooling Tower Water Treatment Stations

Physical Address View project details and contacts
City, State (County) Temple, TX 76504   (Bell County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: The contractor shall provide all equipment, devices, parts, internet connectivity, labor and all resources necessary to accomplish the deliverables described in this statement of work (SOW), except as may otherwise be specified by the Contracting Officer. Provide and install Cooling Tower Chemical Feed Stations in the following buildings and as listed below: 1) Building 063 2) Building 163 mechanical room - 3) Building 203 CUP building- The equipment to be provided and installed in buildings 063, 163 & 203 include but not limited to the followings: - WCT900 Controllers; Conduction/PH/ORP Sensors; PTSA Sensor, Flow Switches; Gateways; 2-Pass Coupon Racks; Controller Racks; Three (3) 160 Gallon Tanks/Tubing Stand Pipes/Feed Rack/Level Gauges; 62 Gallon Tank/Tubing Stand Pipes/Feed Rack/Level Gauges Three (3) Chemical Feed Pumps; Three Pump Boxes; Corp Stop, Miscellaneous Parts and all necessary labor for installation in locations in the mechanical rooms to be identified/specified by the Boiler Plant/AC Operations Supervisor. 4) Building 202 domiciliary building mechanical room 5) Building 171 mechanical room The equipment to be provided and installed in buildings 202 &171 include but not limited to the followings: - WCT900 Controllers; Conduction/PH/ORP Sensors; PTSA Sensor, Flow Switches; Gateways; 2-Pass Coupon Racks; Controller Racks; Two (2) 160 Gallon Tanks/Tubing Stand Pipes/Feed Rack/Level Gauges; 62 Gallon Tank/Tubing Stand Pipes/Feed Rack/Level Gauges Three (3) Chemical Feed Pumps; Three Pump Boxes; Corp Stop, Miscellaneous Parts and all necessary labor for installation in locations in the mechanical rooms to be identified/specified by the Boiler Plant/AC Operations Supervisor. 6) Building 221 CLC mechanical room The equipment to be provided and installed in building 221 include but not limited to the followings: - WCT900 Controllers; Conduction/PH/ORP Sensors; PTSA Sensor, Flow Switches; Gateways; 2-Pass Coupon Racks; Controller Racks; Two (2) 160 Gallon Tanks/Tubing Stand Pipes/Feed Rack/Level Gauges; 62 Gallon Tank/Tubing Stand Pipes/Feed Rack/Level Gauges; Six (6) Chemical Feed Pumps; Six (6) Pump Boxes; Corp Stop, Miscellaneous Parts and all necessary labor for installation in locations to be identified/specified by the Boiler Plant/AC Operations Supervisor. 7) Building 163 at the water-cooled Freezer system The equipment to be provided and installed at building 163 freezer include but not limited to the followings: WCT900 Controllers; Conduction/PH/ORP Sensors; PTSA Sensor, Flow Switches; Gateways; 2-Pass Coupon Racks; Controller Racks; Two (2) 62 Gallon Tanks/Tubing Stand Pipes/Feed Rack/Level Gauges; 62 Gallon Tank/Tubing Stand Pipes/Feed Rack/Level Gauges Three (3) Chemical Feed Pumps; Three Pump Boxes; Corp Stop, Miscellaneous Parts and all necessary labor for installation. The chemical feed system shall be capable of traced inhibitor feed control, 24 hours, 7 days remote web monitoring, accessibility and historical data availability and retrieval capability. The feed control shall not overfeed chemicals but to maintain tight control, optimize the cycles to 3 cycles to reduce chemicals, water use and sewage costs. The system shall be able to control biological activities by confirming the biocide feed and then inject chlorine via ORP to minimize legionella bacteria in the cooling tower water. All feed chemicals shall be contained in the event of a spill or leakage.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents