Similar Projects
Authorized Onsite Soil Evaluators (AOSE); Alternative Onsite Sewage Systems (AOSS) Designers and Installers; Plumbing Contractors/Sewer Service Line Installers
Bidding
VA

Contract for Miscellaneous Parts and Fittings
Post-Bid
Roanoke, VA 24012

Raw Wastewater Pumping Rehabilitation A/E Services
Post-Bid
$77,200 to $106,200 est. value
Fairfax, VA

Water Treatment Plant Modernization and Chrisman Mill Pump Station projects
Results
$24,000,000 est. value
Radford, VA

Building 508 Repair Wet Well Pump Station
Results
$500,000 to $1,000,000 est. value
Portsmouth, VA

Smith Farms Sanitary Sewage Pump Station
New Construction
Construction
$75,000 est. value
Yorktown, VA 23693

Church of Jesus Christ Of Latter-Day Saints - Sanitary Project
Renovation
Construction
Alexandria, VA 22038

Annual Construction Contract for Utility Replacement FY2020-B
Term Contract
Post-Bid
$1,500 to $40,000 est. value
Norfolk, VA 23510

Rosedale Sanitary Sewer Replacement Project
Results
VA

Annual Services Construction Contract 1 for Public Utilities Infrastructure
Term Contract
Post-Bid
Virginia Beach, VA

Royal Street Sewer Separation
Results
$247,400 est. value
Alexandria, VA

Sewer Construction, Cherrytree Lane Sewer Assessment District
Post-Bid
Chesterfield, VA 23235

Little Hunting Creek Sewer Replacement
Results
$1,500,000 to $2,500,000 est. value
Fairfax, VA 22035

Route 50 Pump Station Replacement
Post-Bid
Winchester, VA

Construction of Little Island Park Pump Station 654 Gravity Sewer Force Main System Improvements
Results
Virginia Beach, VA 23456

Last Updated 05/15/2020 02:39 PM
Project Title

Burton Station Sanitary Sewer Pumping Station #370

Physical Address View project details and contacts
City, State (County) Virginia Beach, VA 23456   (Virginia Beach City County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $130,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of new triplex wet well/dry well pump station and connections to existing gravity sewer and force main at Burton Station SS PS. Also installation of City provided diesel powered backup generator.

Details

Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents