Similar Projects
Chromcraft Business Park Phase I
Infrastructure
Bidding
MS

Falkner Water System Improvements CDBG 2020
Infrastructure
Bidding
Falkner, MS

Tucker Road Regional Pump Station 6 SRF Improvements
Post-Bid
Pascagoula, MS

DRA Sewer Improvements
Post-Bid
Heidelberg, MS

Brandon Avenue Sanitary Sewer Improvements (Phase I)
Results
$751,998 est. value
Richland, MS 39218

Wastewater Collection System
Results
Holly Springs, MS

Tiplersville Water System Improvements CDBG 2020
Infrastructure
Bidding
Tiplersville, MS

SR 6 Sanitary Sewer Crossing Force Main Relocation
Post-Bid
Marks, MS

Airport Storm Drain and Sanitary Sewer
Infrastructure
Results
Bolton, MS 39041

Heidelberg Sewer And Pump Station Improvements
Renovation
Bidding
Heidelberg, MS

Phase I Sewer Rehab Project
Post-Bid
Wiggins, MS

Sewer Main Rehabilitation - Phase One
Results
$522,013 est. value
West Point, MS

Sewer System Improvements CDBG 2020
Infrastructure
Bidding
Lambert, MS

Walnut Grove Sewer Rehabilitation - Phase I
Post-Bid
Walnut, MS

Industrial Sewer Improvement
New Construction
Results
$350,000 to $400,000 est. value
MS

Reported 09/16/2021 06:32 PM
Project Title

2020 Sewer Rehabilitation

Physical Address View project details and contacts
City, State (County) Stonewall, MS   (Clarke County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $334,350
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work generally consists of, but is not limited to: Rehabilitation of 3 lift stations, Approximately 20,000 Linear Feet of Sanitary Sewer Cleaning and CCTV Inspection, Inspection of Approx. 80 Manholes, Approximately 300 Linear Feet of CIPP Sewer Liner, Point Repairs, Lining 10 VF of Manholes, and other related items.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Manholes and Structures, Water Utility Distribution Equipment, Water Utility Pumping Stations, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents