Similar Projects
Alternative Programs School Renovation
Renovation
Conception
Greensboro, NC 27401

Doris Henderson Newcomers - 2022 Bond - Guilford County Schools
Renovation
Conception
$1,500,000 est. value
Greensboro, NC 27410

New Hampton/Peeler K-5 Visual & Performing Arts School
New Construction
Design
$33,505,256 est. value
Greensboro, NC 27401

Kiser Middle School Rebuild
New Construction
Design
$55,478,632 est. value
Greensboro, NC 27408

Progressive Design-Build Services for GCS Professional and Community Education Center
New Construction
Post-Bid
$21,700,000 est. value
Greensboro, NC

Middle Music Room Column Repair
Renovation
Results
$40,000 est. value
Greensboro, NC 27405

Building Accident Damage Repairs
Renovation
Results
$100,000 est. value
NC

Triad Math and Science Academy
Renovation - 89,908 SF
Construction
$1,500,000 est. value
Greensboro, NC 27406

Allen Middle School - 2022 Bond - Guilford County Schools
Renovation
Conception
$1,700,000,000 est. value
Greensboro, NC 27406

Smith High School - 2022 Bond - Guilford County Schools
Renovation
Conception
$6,500,000 est. value
Greensboro, NC 27407

Western High School - 2022 Bond - Guilford County School
Renovation
Conception
Less than $6,500,000 est. value
Greensboro, NC 27410

Page High School - 2022 Bond - Guilford County Schools
Renovation
Conception
$13,500,000 est. value
Greensboro, NC 27405

Weaver Academy - 2022 Bond - Guilford County Schools
Renovation
Conception
Less than $3,500,000 est. value
Greensboro, NC 27401

Lincoln Academy - 2022 Bond - Guilford County Schools
Renovation
Conception
$3,000,000 est. value
Greensboro, NC 27401

Grimsley High - 2022 Bond - Guilford County Schools
Renovation
Conception
$6,500,000 est. value
Greensboro, NC 27408

Last Updated 07/18/2022 02:55 AM
Project Title

New Kiser Middle School Phase I

Physical Address View project details and contacts
City, State (County) Greensboro, NC 27408   (Guilford County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Accepting Qualifications, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $10,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Phase I of this project consist of Providing a temporary access road for the existing Brooks Global Elementary School and construction fencing around the construction site.

Details

Middle/Senior High School, New Construction.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents