Similar Projects
Streets Division - South 11th Street (Indiana Avenue to Union Avenue) - City of Sheboygan
Infrastructure
Conception
$1,000,000 CJ est. value
Sheboygan, WI 53081

Streets Division - South 11th Street (Indiana Avenue to Union Avenue) - City of Sheboygan
Infrastructure
Conception
$1,000,000 CJ est. value
Sheboygan, WI 53081

Biggby Coffee / Sheboygan
New Construction, Infrastructure
Design
$500,000 CJ est. value
Sheboygan, WI 53083

City of Plymouth Const / Misc-Sidewalk Improv NMTPP
Infrastructure
Design
$2,000,000 CJ est. value
Plymouth, WI 53073

Sheboygan Co - County Rd
Infrastructure
Bidding
$8,000,000 CJ est. value
Sheboygan, WI 53081

Sheboygan Co - County Rd
Infrastructure
Bidding
$8,000,000 CJ est. value
Sheboygan, WI 53081

Random Lake K-12 Additions and Alterations
Addition, Demolition, Renovation, Infrastructure - 22,900 SF
Sub-Bidding
$5,000,000 CJ est. value
Random Lake, WI 53075

Paving Work on 26th Avenue (Swamp Road)
Infrastructure
Post-Bid
$80,000 est. value

Jimmy Johns - SITE WORK / Plymouth
Infrastructure
Post-Bid
$100,000 CJ est. value
Plymouth, WI 53073

2022 Street Repairs
Infrastructure
Results
$270,000 est. value
Sheboygan Falls, WI

Chip Seal, Single Seal
Infrastructure
Results
$80,000 est. value
WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Tidy Store Gas Station Addition
Addition, Infrastructure - 1,500 SF
Pending Verification
$400,000 CJ est. value
Sheboygan, WI 53081

The Kohler Company Golf Course
New Construction, Infrastructure
Pending Verification
$7,000,000 CJ est. value
Sheboygan, WI 53081

Last Updated 10/17/2023 10:12 AM
Project Title

750,000 Gallon Water Tower 3

Physical Address View project details and contacts
City, State (County) Sheboygan, WI 53081   (Sheboygan County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $4,164,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Any person monitoring the meeting remotely may be responsible for any documented costs. Message and data rates may apply. Major Quantities on the Project Include: 1 LS Site Grading 1 LS Clearing and Grubbing 400 TON Base Aggregate 125 TON HMA Pavement 315 SF Concrete Sidewalk/Driveway 1 EACH Connect to Existing Water Maintenance 515 LF PVC C-900 Water Main 5 EACH 12-inch Gate Valve 2 EACH Hydrant Assembly 1 LS Access Gate 65 LF CMP Culvert Pipe 12 CY Rip Rap 530 SY Erosion Matting 400 LF Silt Fence 325 LF Sediment Control Log 0.6 ACRE Temporary Seeding 0.6 ACRE Seeding 300 SY Native Seeding 1 LS 750,000-Gallon Composite Hydropillar Tank Bid security in the amount of 5 percent of the Bid must accompany each Bid in accordance with the Instructions to Bidders. Bidders Proof of Responsibility must be submitted to SEH in accordance with the Instructions to Bidders. Contractors on the Project shall be required to comply with the minimum wages in effect for the State of Wisconsin. The Town of Sheboygan | Sanitary District No. 3 (Water) reserves the right to reject any and all bids, to waive irregularities and informalities therein and to award the Contract in the best interests of the Town/District. Question Deadline 03/05/2023 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents