Similar Projects
Fulton 58 School District-Secure Vestibule Upgrades
Renovation
Post-Bid
Fulton, MO 65251

Spoede Elementary School
Addition
Post-Bid
Saint Louis, MO 63141

Disaster Recovery Services
Results

Disaster Recovery Services
Results

Briarcliff Elementary
Renovation, Addition - 10,300 SF
Construction
Kansas City, MO 64116

Fordland Bond Projects
Renovation, Addition
Post-Bid
Fordland, MO 65652

Mark Twain Elementary Gym-Music safe Room and Eugene Elementary Gym-Music safe Room
Addition
Results
Springfield, MO 65807

Elementary & High School Classrooms
Addition - 5,425 SF
Post-Bid
Silex, MO 63377

North Glendale Elementary, Secured Vestibule Renovation Project 2021
Renovation
Results
Kirkwood, Saint Louis, MO 63122

AG Building Connecting Corridor
Post-Bid
Bevier, MO

McGrath Elementary School And ECC: Building Package (Phase 1)
New Construction
Results
Brentwood, MO 63144

York Elementary School
New Construction
Post-Bid
Springfield, MO 65802

McGrath Elementary School and ECC Building Package (Phase 1) Brentwood School District
New Construction
Results
$15,000,000 to $16,000,000 est. value
Brentwood, MO 63144

Dover Hill Elementary School Phase 2
New Construction
Post-Bid
Joplin, MO 64801

Fieldhouse Project
New Construction
Results
Bowling Green, MO

Reported 11/10/2021 02:57 PM
Project Title

Ladue Old Bonhomme Elementary

Physical Address View project details and contacts
City, State (County) Saint Louis, MO 63132   (Saint Louis County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method
Project Status Construction Commenced June 2021, Construction Completion Expected September 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Brand New Gymnasium / Storm Shelter – New Precast Gymnasium and Storm Shelter on the West side of the school. This will include a new stage, music room, and mechanical rooms adjacent to the Gymnasium. New Classroom Addition – A structurally framed brick classroom addition on the East side of the Elementary school. The addition will consist of new classrooms, wet labs, elevators, and faculty planning rooms. Multi-Phase Renovation to the Existing School – The renovations will consist of upgrades to the classrooms, a new cafeteria, new sprinkler system and more.

Details

Elementary School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents