Similar Projects
Fountain City Service Base Sustainment & Modernization
Design
Fountain City, WI

Port Washington Harbor Breakwater Repairs
Term Contract
Design
$1,000,000 to $5,000,000 est. value
Port Washington, WI

Zoo Path Emergency/Temporary Repair
Infrastructure
Bidding
$30,000 to $60,000 est. value
Racine, WI 53402

Excavation and Rebuilding of a Drainage Pond on the Districts Property
Infrastructure
Bidding
West Bend, WI

Prospect Road Culvert
Post-Bid
Beaver Dam, WI 53916

Culverts
Term Contract
Post-Bid
WI

Operations Truck Ramp, Scale and Drainage Improvements
Results
Beloit, WI

South Fork Pheasant Branch Creek Repairs to Channel
Results
Madison, WI 53562

Lock Road - CTH U Storm Sewer, Golf Coarse Drive Storm Sewer and WPS Pond
Infrastructure
Bidding
Wrightstown, WI 54180

Concrete Culverts
Post-Bid
WI

2020 La Crosse River Bank Stabilization
Results
Less than $50,000 est. value
La Crosse, WI 54601

Erosion Control Devices
Term Contract
Post-Bid
WI

Steam Pits 14 Replacement - MEP
Results
Less than $320,000 est. value
Stevens Point, WI 54481

2021 Gramling Lane Culvert Replacement
Post-Bid
Less than $300,000 est. value
Dousman, WI 53118

Steam Pits 14 Replacement - General
Results
Less than $320,000 est. value
Stevens Point, WI 54481

Last Updated 11/15/2021 09:58 AM
Project Title

Shoreline Revetment Communiversity Park

Physical Address View project details and contacts
City, State (County) Green Bay, WI 54311   (Brown County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $130,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In general the work consists of: Shoreline restoration at Communiversity Park. Work includes excavating and filling the eroded shoreline, placing geotextile fabric, turf reinforcement mat, and riprap armor stone along the shoreline

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents