Similar Projects
2022 Quaker Valley Culvert Reconstruction Project
Infrastructure
Design
Farmington Hills, MI

Paving & Site Lighting
Post-Bid

2021 Street Sweeping
Term Contract
Post-Bid
Farmington, MI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

19.56 MI of Hot Mix Asphalt Cold Milling and Resurfacing, Full Depth Concrete Pavement Repairs, Joint Repairs and Pavement Markings
Results

Street Sweeping
Term Contract
Post-Bid
Lake Orion, MI

Concrete Joint Repair
Results
Novi, MI

Removal of Thin Epoxy Overlay
Infrastructure
Post-Bid

2021 Butler Road Rehabilitation Program
Results
Rochester Hills, MI 48306

Three (3) Boss Snow Plows
Infrastructure
Post-Bid
Rochester Hills, MI

2021 Pavement Reconstruction
Results
Lathrup Village, MI

FPE Cip Paving 2021
Infrastructure
Post-Bid
Waterford Township, MI 48328

Paving Program - Phase 2
Results
Troy, MI

Road Repair - Hma Thermal Bond
Infrastructure
Post-Bid
MI

Calumet-Swedetown Trail Capping, And Route Grading
Results

Last Updated 08/02/2022 12:09 PM
Project Title

Airline Trail Construction Engineering Phase 2 - City of Wixom

Physical Address View project details and contacts
City, State (County) Wixom, MI 48393   (Oakland County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $700,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 2, 2022, an engineer has been selected for the project. A firm timeline for construction has not been disclosed. *The closed solicitation has been included below for reference: The City of Wixom is requesting proposals for a construction engineering of a Michigan Air Line Trail and the Huron Valley Trail extension. The trail construction will be from Wixom Road in Wixom, Michigan to Old Plank Road in Milford Township, Michigan. Construction Engineering Bids will be accepted until September 13, 2021. Question Acceptance Deadline 08/23/2021 05:00 PM EDT Questions are submitted online No Method of Contractor selection has not been determined at this point of time.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents