Similar Projects
2021 Brewery Sanitary and Watermain Improvements
New Construction, Infrastructure
Bidding
Cold Spring, MN

CSAH 39 Sanitary Sewer and Water Extensions
New Construction, Infrastructure
Bidding
Fairmont, MN

Lift Station Maintenance and Repair Services
Term Contract
Post-Bid
Less than $175,000 est. value
Minneapolis, MN

DNR2 RFB Brainerd Office Replacement Lift Pumps
Renovation
Post-Bid
Brainerd, MN 56401

Wood Lake Lift Station Improvements
Results
$625,000 est. value
Richfield, MN

Ridgedale Booster Station Improvements
Results
$450,000 est. value
Minnetonka, MN 55345

Booster Station and Well 16 Rehabilitation
Renovation, Infrastructure
Bidding
Blaine, MN

2021 Sanitary Lift Station No. 33 and No. 34 Improvements
Renovation
Post-Bid
$532,065 est. value
Moorhead, MN

Williston Road Lift Station Rehabilitation
Results
$1,950,000 est. value
Minnetonka, MN

Lift Station 7 and 10 Rehabilitation
Renovation
Bidding
Shorewood, MN

Utility Improvements
Post-Bid
Minnetrista, MN

DNR4 Gilfillan Lake WMA Pump Control Replacement
Renovation
Results
$35,000 est. value
MN

Lakefield Infrastructure Improvement
New Construction
Post-Bid
Lakefield, MN

Storm Lift Station Improvements
Results
$735,000 est. value
Eagan, MN

Eden Avenue and Brookside Avenue Improvements
New Construction
Post-Bid
$3,500,000 est. value
Edina, MN 55435

Last Updated 06/16/2021 11:53 AM
Project Title

Middle Booster Station Improvements

Physical Address View project details and contacts
City, State (County) Duluth, MN 55812   (Saint Louis County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construct upgrades to the existing Middle Booster Station located at 1519 East 6th Street, in the City of Duluth. The project will upgrade the pumping and electrical systems in the existing building. The project work includes upgrading three 350 HP split case water booster pumps, under floor process piping, Above floor process piping, replace concrete floor, interior door, upgrade electrical service from medium voltage to new 1600 amp 480V service, new electrical gear include VFD motor controller, demolish the existing medium voltage electrical system and motor controllers, construct new overhead 20-inch discharge header, construct new 20-inch discharge water main connected to the existing water distributions system, construct new site utilities, and provide surge mitigation tank.

Details

Lift and Pump Stations, New Construction.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents