Similar Projects
Waffle House at Oxford Commons
New Construction - 1,800 SF
Conception
Oxford, MS 38655

Walthall Schools Renovation Projects
Renovation
Conception
Tylertown, MS

Asian Market And Restaurant
Renovation
Design
Tupelo, MS 38801

Forest County Agricultural High School Addition & Renovation Esser 3 Project
Renovation, Addition
Design
Brooklyn, MS 39425

Just Love Coffee #1037
New Construction
Bidding
Tupelo, MS 38804

Lumberton Softball Concessions and Restrooms
New Construction
Bidding
Lumberton, MS

The Commons - Entertainment Block
New Construction - 28,359 SF
Sub-Bidding
$1,000,000 to $5,000,000 CJ est. value
Oxford, MS

Target #T1169 - Cafe Remodel
Renovation - 1,100 SF
Post-Bid
Horn Lake, MS 38637

General Construction - Long Beach School District Hurricane Repairs
Post-Bid
Long Beach, MS 39560

Bailey Apac Middle School Renovations
Renovation
Results
Jackson, MS 39202

Renovations to Natchez High School
Renovation
Results
Natchez, MS 39120

Starbucks Shell
New Construction - 2,172 SF
Construction
$500,000 to $1,000,000 CJ est. value
Biloxi, MS 39531

Sonny's BBQ
New Construction - 4,476 SF
Construction
$750,000 est. value
Clinton, MS 39056

Twisted Kitchen Restaurant
Build-Out - 4,136 SF
Pending Verification
Gluckstadt, MS

Huey Magoo's
New Construction
Pending Verification
Natchez, MS

Reported 01/14/2022 11:40 AM
Project Title

Central High School Cafeteria Addition

Physical Address View project details and contacts
City, State (County) Southaven, MS 38672   (DeSoto County)
Category(s) Commercial, Education
Sub-Category(s) Food/Beverage Service, Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $599,500
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of constructing of a new 800 SF cafeteria school building located at the existing Desoto Central High School Campus located at 2911 Central Parkway, Southaven, MS 38672. The new facilities will include all associated site work which includes grading, paving, drainage, utilities, and other related work as shown on the drawings and/or described in the specifications. Project will also include renovating existing classroom space to expand the cafeteria dining area.

Details

Middle/Senior High School, Renovation, Food/Beverage Service, 800 SF Addition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 10 - Specialties, Signage.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents