Similar Projects
Springfield Twp Multimodal Trail Ph 2
Infrastructure
Conception
$10,000 CJ est. value
Mercer, PA 16137

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

State Street Pedestrian Improvements
Infrastructure
Design
$1,006,200 CJ est. value
Hermitage, PA 16148

State Street Pedestrian Improvements
Infrastructure
Design
$1,006,200 CJ est. value
Hermitage, PA 16148

23 WHM SGL 211 Railroad Grade Road Phase 1
Infrastructure
Post-Bid

300 Tons Superpave Wearing Course
Infrastructure
Post-Bid
Grove City, PA

Multimodal Phase III Contract
Infrastructure
Results
$1,300,000 to $1,500,000 est. value
Sharon, PA

Multimodal Phase III Contract
Infrastructure
Results
$1,300,000 to $1,500,000 est. value
Sharon, PA

Waterline Replacement Projects - Group 2
Infrastructure
Construction
$734,995 CJ est. value
Greenville, PA 16125

Waterline Replacement Projects - Group 2
Infrastructure
Construction
$734,995 CJ est. value
Greenville, PA 16125

McAlister's Deli / Hermitage
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Hermitage, PA 16148

McAlister's Deli / Hermitage
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Hermitage, PA 16148

US 22/322 PM
Infrastructure
Conception
$2,850,000 CJ est. value
West Hanover, PA 17112

Southwest of Euclid Bridge
Demolition, New Construction, Infrastructure
Design
$1,961,171 CJ est. value
Franklin Township, PA 16001

Asphalt Paving At 8 LNA Sites
Term Contract
Post-Bid

Last Updated 06/26/2023 03:05 PM
Project Title

Starbucks / Hermitage

Physical Address View project details and contacts
City, State (County) Hermitage, PA 16148   (Mercer County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Food/Beverage Service, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $350,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of June 26, 2023, the project is in development. The land development plan was submitted in May 2023 to the City of Hermitage Planning Department and is under review. Information regarding the Architect and General Contractor is unknown. Construction start, though unverified is not expected prior to fourth quarter 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Parking Spaces, 43 Parking Spaces.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Resilient Flooring, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Refrigerated Display Equipment, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Countertops, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents