Similar Projects
KOA Lift Station
Post-Bid
$650,000 to $680,000 est. value
Montgomery, TX 77356

Mackenzie Creek Section 2 Lift Station
Post-Bid
Conroe, TX 77301

Lift Station No. 1 Improvements
Results
$850,000 est. value
TX

Lift Station C Replacement
Results
Porter Heights, TX

Construction of Regional Lift Station and Local Lift Station Number 2 for Chapel Run
New Construction
Post-Bid
TX

Conroe Industrial Park Utilities Sanitary Sewer Lift Station
Results
Less than $788,000 est. value
Conroe, TX 77301

WWTP Lift Station
New Construction
Post-Bid
TX 77356

Construction of the Woodforest Lift Station No. 6
Results
TX

Pine Lake Cove - Lift Station No. 1
Results
Conroe, TX

Rivers Edge Lift Station No. 1 - Phase 1
Results
Conroe, TX

Lift Station No.3
Results
TX

Lift Station No. 1 for The Highlands
Results
Less than $650,000 est. value
TX

Construction of Lift Station No. 1
Results
TX

Construction of the Mustang Ridge Lift Station Number 1
Results
TX

West Summerlin and Gun Range Lift Station Consolidation
Results
$470,000 est. value
Conroe, TX 77301

Last Updated 06/14/2021 09:08 AM
Project Title

Lift Station No. 13 Rehabilitation - SJRA Woodlands Division

Physical Address View project details and contacts
City, State (County) The Woodlands, TX   (Montgomery County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,790,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work of the contract is for the construction of Lift Station No. 13 Rehabilitation, including but not limited converting the existing dry pit/wet well set up to a submersible pump layout, the replacement or relocation of the lift station electrical equipment as indicated. In the contract documents, the replacement of the existing wet well top slab, the replacement of the associated piping, mechanical, and electrical items, and related site work. Construction will also include establishing temporary diversion pumping and constructing permanent diversion pumping connections, tree protection, coordination with the Woodlands Township, constructing concrete driveway, raising the electrical. Controls via a permanent platform, installation of a natural-gas generator, associated site grading, off-site grading, constructing a grass swale, and constructing a concrete swale with riprap to provide positive drainage as specified in the contract documents.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents