Similar Projects
Telecommunication Structure - Pinedale Tower
Post-Bid
Pinedale, AZ 85934

ACRx Node Tower and Building Rooftop Antenna Installation Services (IDIQ) Contract
Post-Bid

The Federal Aviation Administration (FAA) has a Requirement for the Tower Repairs at Black Peak, Black Mountain, and White Tank in Arizona.
Results
AZ

Integrated Fixed Tower, Ajo & Casa Grande, AZ
Results
$10,000,000 to $15,000,000 est. value
Ajo, Casa Grande, AZ 85321

T-Mobile PH60112a - Apache Auto
New Construction
Pending Verification
Mesa, AZ 85207

Airport Tower Maintenance
Post-Bid
Chandler, AZ 85286

Design, Provide, Install, Warranty for Three (3) Turnkey Distributed Antenna Systems
Term Contract
Results
Mesa, AZ

Replacement of County Distributed Antenna Systems
Post-Bid
Tucson, AZ

Glen Canyon Microwave Tower Construction Project
Results
$300,000 to $600,000 est. value
Page, AZ

Cooling Towers
Term Contract
Results
$400,000 to $500,000 est. value
Yuma, AZ 85364

Communications Tower Service
Results
Mesa, AZ 85211

Mingus Mountain Communication Tower
Results
$250,000 to $500,000 est. value
Yampai, AZ

Communication Pole Installation
Results
Buckeye, AZ

Last Updated 04/27/2020 11:47 AM
Project Title

Dema Picacho Navigation Beacon Installation (M19-0005) Single

Physical Address View project details and contacts
City, State (County) Eloy, AZ   (Pinal County)
Category(s) Tower/Signal System
Sub-Category(s) Tower/Signal System
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Picacho Airfield requires a 55 foot or taller rotating airfield beacon in order to meet the requirements of UFC 3-535-01. The CFMO is in possession of a L801 rotating beacon. The beacon needs to be installed on a pole or tower that will allow easy access to the beacon for maintenance and repair. This project is to provide a fully functional navigation tower with rotating beacon in accordance with FAA and Army regulations. This project will involve the purchase and installation of a minimum 55 foot Hali-Brite tip down pole (or equivalent) compatible with an L801 beacon. The beacon has been purchased and will need to be installed on the completed tower. Contractor will need to purchase the pole, design and construct a foundation, run and tie in any needed utilities, and provide all needed hardware for mounting. This project will be built at the AZARNG Picacho Airfield in Picacho, Arizona.

Details

Division 13 - Special Construction, Towers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents