Similar Projects
El Paso Medical Clinic
New Construction, Infrastructure - 4,700 SF
Design
$940,000 CJ est. value
El Paso, TX 79936

Veterans Park Recreation Center Expansion - City of El Paso
Addition, Infrastructure - 28,736 SF
Design
$198,230 CJ est. value
El Paso, TX 79924

US 54 - Hazard Elimination and Safety
Infrastructure
Bidding
$1,563,337 CJ est. value
El Paso, TX 79924

FM 76 - Hazard Elimination and Safety
Infrastructure
Bidding
$2,286,929 CJ est. value
Socorro, TX 79927

Socorro Village Apartments Renovation
New Construction, Renovation, Infrastructure - 50,000 SF
Sub-Bidding
$6,371,407 CJ est. value
Socorro, TX 79927

Riverside High School CTE Addition & Renovation - Phase 4 Package
Addition, Demolition, Renovation, Infrastructure
Sub-Bidding
$22,000,000 CJ est. value
El Paso, TX 79915

Sewer Lift Station Pump Replacements at the Ambrosio Guillen Texas State Veterans Home
New Construction
Post-Bid
$100,000 est. value
El Paso, TX 79924

Grease Traps, Lifts Stations, Septic Tanks, Waste Removal and Related
New Construction, Infrastructure
Post-Bid
El Paso, TX

Phosphate Feeding Facilities at Five Booster Station Sites
Addition
Results
$2,961,580 to $3,372,911 est. value
El Paso, TX

Construction of Coronado I Booster Station Pump Can Replacement
New Construction
Results
$189,900 to $278,520 est. value
El Paso, TX

Phase 1, Shell Building 'C' / Mountain Pass Business Park
New Construction, Infrastructure - 16,100 SF
Pending Verification
$1,460,000 CJ est. value
El Paso, TX 79925

Chick-fil-A #4801 / El Paso
New Construction, Infrastructure - 4,828 SF
Pending Verification
$1,200,000 CJ est. value
El Paso, TX 79928

SL 375 - Hazard Elimination and Safety
Infrastructure
Bidding
$831,043 CJ est. value
El Paso, TX 79905

IH0010 - Metal Beam Guard Fence and Chain Link Fence Repair
Infrastructure
Sub-Bidding
$1,206,025 CJ est. value
El Paso, TX 79927

Drilling Services at El Paso, TX
Term Contract
Post-Bid
El Paso, TX

Last Updated 07/26/2022 03:37 PM
Project Title

Ranchos Real 6.1 MGD Pump Station and Airport Booster Station Replacement

Physical Address View project details and contacts
City, State (County) El Paso, TX 79901   (El Paso County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $18,481,484 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Ranchos Real Pump Station and Airport Booster Station Replacement Questions Deadline: July 13, 2022 at 5:00 PM (MST) Answers Posted: July 19, 2022 at 5:00 PM (MST) Questions can be sent to: purchasing.info@epwater.org Engineer Estimate: $16,227,644.95 - $18,481,484.53 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents