Similar Projects
Richfield City Sewer Lagoon Improvements and Sewer Collection Pipe Upgrades
Bidding
Richfield, UT

UDOT Hanksville MS4 Project
Term Contract
Bidding
Hanksville, UT 84734

Lehi City Lower School House Springs
Post-Bid
Lehi, UT 84043

500 West Sewer Improvements Project
Post-Bid
Vernal, UT

2018 West Jordan Manhole Raising Project
Results
$161,900 est. value
West Jordan, UT

Z--Sanitary Server Lining at Jones Hole National Fish
Results
$500,000 to $1,000,000 est. value
Vernal, UT 84078

Dooley Court
Bidding
$1,097,130 est. value
Salt Lake City, UT 84102

On-Call Task Order General Construction Services FY 19/20
Term Contract
Post-Bid
Salt Lake City, UT

104th and Bangerter Relocation
Term Contract
Results
Less than $1,300,000 est. value
Bluffdale, UT 84065

1800 North Sewer Realignment
Post-Bid
Salt Lake City, UT 84116

Installation and Repair of Sanitary Sewer Facilities
Results
Less than $125,000 est. value
Salt Lake City, UT

19D: Large Meter Replacement Project
Post-Bid
West Valley City, UT

MP15 - 700 South Interceptor Capacity Upgrade and 700 South Water Main
Results
Less than $3,293,600 est. value
Salt Lake City, UT 84115

Construction of the Tonaquint Sewer Project
Post-Bid
Saint George, UT 84770

Waste Pumping
Results
Provo, UT 84606

Last Updated 11/14/2019 10:47 AM
Project Title

Bench Lake Area Sewer Project

Physical Address View project details and contacts
City, State (County) Hurricane, UT 84737   (Washington County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,500,000 to $4,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the installation of a new sewer lift station, approximately 15,000 lineal feet of 10", 12" and 15" gravity sewer line, manholes and appurtenances, and approximately 7,300 lineal feet of 8-inch pressure sewer line and appurtenances. The project includes installation of 24-inch steel casing for the pressure sewer line through the UDOT right of way for the future Southern Parkway. The project also includes grading of the future road along 3070 West, installation of drainage culverts, roadbase, relocating conflicting utilizes and replacing any improvements damaged or removed during the project including, asphalt and fencing.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents