Similar Projects
New City Hall Complex
New Construction
Conception
Less than $5,700,000 est. value
Lake City, FL 32055

Criminal Justice Center Renovation and Five Points Building System Improvements
Renovation
Conception
Sanford, FL 32773

North Dade Government Center, Landmark Site
- 15,500 SF
Design
$7,500,000 est. value
Miami, FL 33055

Judicial Center Renovations
Renovation, Addition - 21,356 SF
Design
Brooksville, FL 34601

RFQ Construction Manager - Remodeling and Renovation and Selective Restoration and Preservation Services for the David W. Dyer U.S. Court House
Build-out, Renovation
Bidding
$70,000,000 CJ est. value
Miami, FL 33132

RFP Construction Manager at Risk (CMAR) - Main County Courthouse Buildout and Renovations Project
Renovation
Bidding
$30,000,000 CJ est. value
West Palm Beach, FL 33401

City Hall
New Construction - 85,125 SF
Post-Bid
Largo, FL 33779

RPB Village Hall Construction Services
New Construction - 25,380 SF
Post-Bid
Less than $9,900,000 est. value
Royal Palm Beach, FL 33411

Ft Meyers Courthouse Roofing Building Enclosure Repairs
Renovation
Results
$1,000,000 to $5,000,000 est. value
Fort Myers, FL 33901

Juvenile Justice Courthouse
New Construction - 57,986 SF
Results
$10,000,000 est. value
Panama City, FL

New City Hall and Municipal Campus Improvements
- 120,000 SF
Construction
Sunrise, FL

New Northeast Polk County Government Center
New Construction - 70,000 SF
Construction
$16,000,000 est. value
FL

Fort MCcoy Building Renovation 1-11, 13-17
Addition
Pending Verification
$15,277,396 est. value
FL

New City Hall
New Construction
Conception
$30,000,000 est. value
Clearwater, FL

Courthouse Expansion
Addition
Design
$15,000,000 est. value
Panama City, FL

Last Updated 08/23/2022 05:01 PM
Project Title

Hernando County Courthouse & Judicial Center Renovations

Physical Address View project details and contacts
City, State (County) Brooksville, FL 34601   (Hernando County)
Category(s) Government/Public
Sub-Category(s) Capitol/Court House/City Hall
Contracting Method Competitive Bids
Project Status Obtained from a credible source, Awaiting verification, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $24,633,884 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for upgrades to the Courthouse building including expanding courtrooms, enhancing security, creating a brand-new entrance and lobby, and enhancements to parking including 7 ADA parking spaces. As of August 23, 2022, construction has not started. A general contractor has been selected. Construction is set to begin on September 13, 2022 and is estimated to continue through the Spring of 2024.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents