Similar Projects
Z--CO-BACA NWR-Passage Ditch 9 &10
Term Contract
Design
$100,000 to $250,000 est. value
Crestone, CO 81131

Huron Outfall Storm Pipe Project
Infrastructure
Bidding
CO

2021-2022 Courthouse Alley Drainage Project
Infrastructure
Bidding
Ridgway, CO

2" Flexible Conduit
Post-Bid
Fort Collins, CO 80521

MSE Wall Repair Project
Post-Bid
Avon, CO 81620

Landfill Cell Project
Results
Less than $368,733 est. value
Grand Junction, CO 81503

Z--BLM CO NWD KFO Junction Butte Dsgn-Bld
Results
$25,000 to $100,000 est. value
Kremmling, CO 80459

Kinston Millennium East 15th and 16th Subdivision
Infrastructure
Bidding
Loveland, CO

Precast Concrete Box Culvert
Post-Bid
Montrose, CO 81401

Removal of Asphalt Mat Ditch Grading, Placement of Topsoil and Seeding
Results
$1,000,000 to $5,000,000 est. value
CO

Tunnels Stabilization
Infrastructure
Bidding
Buena Vista, CO 81211

2020 Still Water Ditch Improvements project
Post-Bid
Steamboat Springs, CO 80477

Swan River Restoration Reach B Design Build Project
Results
Breckenridge, CO 80424

Crystal River Embankment Stabilization Project
Infrastructure
Bidding
CO

2020 South Boulder Road Culvert Lining
Post-Bid
Louisville, CO 80027

Last Updated 12/30/2021 11:25 AM
Project Title

Victoria Avenue Drainage Infrastructure Improvement Project

Physical Address View project details and contacts
City, State (County) Alamosa, CO   (Alamosa County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project, entitled “Victoria Avenue Drainage Infrastructure Improvement Project” will be completed in 2 phases. The City is only accepting bids for phase 1 at this time. Phase 1 consists of two schedules; each schedule is briefly described as follows: 1. Schedule 1 work includes the installation of a concrete lift station vault, installation of pumps and controls (City supplied), and electrical installation at lift station 2. Schedule 2 work includes construction of the collection basin and pipe and trench work needed to tie into City infrastructure.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents