Similar Projects
Construction of the Round Hill to Franklin Park Trail and Main Street Projects
Results
Round Hill, VA 20141

Echo/Leesburg Business Park Punch List Work Completion
Results
$29,665 est. value
Leesburg, VA 20175

Brambleton Regional Park Golf Course Parking Lot Renovations
Results
Ashburn, VA 20148

Operation and Maintenance of the Combined Transit System
Post-Bid
Leesburg, VA 20175

Hatcher Avenue Sidewalk Improvements
Results
Purcellville, VA

Small Communities Ops Center Parking Lot and Laydown Area - (Mp013400)
Results
West Point, VA 23181

Parking and Drive Extension
Results
VA

Sutton Drive Sidewalk
Results
Purcellville, VA 20132

Pedestrian Improvements
Post-Bid
Hamilton, VA 20158

Construction/Installation of Pedestrian Improvements - Phase I
Results
$457,930 est. value
Hamilton, VA 20158

West Market Street (Ayr Street to Morven Park Road) Sidewalk Improvements
Results
$1,579,790 est. value
Leesburg, VA 20176

Repair Crosswalks on US 50 in Middleburg
Results
Less than $653,000 est. value
VA

Statewide ADA Project Group II
Results
VA

King Street Alley Improvements
Results
$79,369 est. value
Leesburg, VA

Dulles Transit Center Renovation
Renovation
Results
VA

Last Updated 05/19/2020 03:40 PM
Project Title

Edwards Ferry Road Bus Shelters and Sidewalk

Physical Address View project details and contacts
City, State (County) Leesburg, VA   (Loudoun County)
Category(s) Heavy and Highway, Transportation
Sub-Category(s) Misc. Structures, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes replacement of curb and sidewalk, installation of two bus shelters and concrete pad, traffic control, restriping of crosswalk and all incidentals related thereto.

Details

Division 03 - Concrete, Cast-in-Place Concrete.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 10 - Specialties, Signage, Protective Covers, Transportation Stop Shelters.
Division 12 - Furnishings, Multiple Seating, Pews and Benches, Benches.
Division 26 - Electrical, Lighting.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Sidewalks.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents