Similar Projects
2022 Tar and Chip Project
Infrastructure
Design
$30,000 CJ est. value
Parryville, PA 18244

Installation of Bollards at Entrances to All District Schools
Infrastructure
Design
Lykens, PA 17048

Ready Mixed Concrete and Cement/Concrete Products
Term Contract
Bidding

Ready Mixed Concrete and Cement/Concrete Products
Term Contract
Bidding

Simi-Calcine Dolomite (AKDOLIT)
Term Contract
Sub-Bidding
Pittsburgh, PA 15219

Demolition of 1330 Greenwich Street
Demolition, Infrastructure
Sub-Bidding
$50,000 CJ est. value
Reading, PA 19604

Construction of a Sludge Transfer Bed
Alteration
Post-Bid
Brookville, PA

Precast Concrete Inlets and Risers
Alteration
Post-Bid
Carnegie, PA

Borough Garage Concrete Pad Project
Alteration
Results
Robesonia, PA

Transfer Station Complex Tipping Floor Repair Project
Alteration
Results
Lancaster, PA 17603

Honeymoon Trail Rd Over Tributary to Pine Creek
Demolition, New Construction, Infrastructure
Bidding
$1,000,000 CJ est. value
Lykens, PA 17048

Fairview Hills Concrete Revitalization Project Phase II
Alteration
Post-Bid
Altoona, PA 16601

2021 Inlet Procurement Project
Alteration
Results
Hazleton, PA

Replacement of Bridge NB-349 at Milepost A57.06 in Lehigh County
Infrastructure
Bidding
$20,000,000 CJ est. value
Harrisburg, PA 17102

Portland Concrete
Alteration
Post-Bid
Chambersburg, PA

Last Updated 06/19/2023 05:35 AM
Project Title

Horseshoe Pike at Manor Rd.

Physical Address View project details and contacts
City, State (County) West Brandywine, PA 19343   (Chester County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $1,920,809 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Construction of Roadway Widening, Roadway Resurfacing, Traffic Signal Upgrades and Other Miscellaneous Construction for the Addition of Left Turn Lanes on Horseshoe Pike (Sr 0322) at the Intersection With Manor Road (Sr 0082), as Indicated on the Approved Drawings Included in the Big Package for State Route 0332 and State Route 0082, Section Sip, in Chester County, West Brandywine Township From Segment 0150 Offset 3024 to Segment 0160 Offset 1129. Project Cost Range: $1,000,000.00 - $2,499,999.99 Federal Project Status: PENNDOT Oversight NHS Structure Work: 0.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: New and Revised Major Traffic Signals PennDOT - Horseshoe Pike at Manor Road

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents