Similar Projects
Saint Timothy Catholic School Gym and Classroom Addition - Phase 3
New Construction, Addition - 32,349 SF
Conception
Union, KY 41091

Career Technology Center Renovation
Renovation
Design
Bardstown, KY

Bardstown HIgh School Renovation
Renovation
Design
Bardstown, KY

Corbin Middle School Concessions / Restrooms
Post-Bid
$215,000 est. value
Corbin, KY 40701

Corbin High School Career Center - Phase 1
Post-Bid
Less than $2,500,000 est. value
Corbin, KY 40701

Central Hardin High School - Bid Group 1
Renovation, Addition
Results
Cecilia, KY 42724

Harrison County Middle School Football Field Improvements
Results
Cynthiana, KY 41031

Boone County High School Addition and Renovations
Renovation, Addition - 18,573 SF
Construction
Less than $8,379,900 est. value
KY

Assumption High School Expansion
Addition - 35,000 SF
Construction
Louisville, KY 40205

School Buildings
New Construction
Pending Verification
$22,434,420 est. value
Bowling Green, KY 42104

New Pavilion - Hopkins County School
Addition - 960 SF
Pending Verification
$10,000 est. value
Madisonville, KY

Bardstown Middle School Renovations
Renovation
Design
Bardstown, KY

Ohio Valley Education Co-Op
Renovation, Addition
Post-Bid
Louisville, KY 40258

Shelby County High School Renovation
Renovation
Results
Shelbyville, KY 40065

Rise Academy Improvements
Renovation
Construction
Less than $4,500,000 est. value
Florence, KY 41042

Reported 04/20/2022 12:00 AM
Project Title

Security Vestibules at Four Grayson County Schools

Physical Address View project details and contacts
City, State (County) Leitchfield, KY   (Grayson County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $498,438 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consists of selective demolition and construction of new security vestibules within the existing lobbies of four separate school facilities. New construction shall include but not be limited to new steel stud and gypsum board partitions, aluminum storefront frames, new doors and frames, new ceilings and finishes, custom casework, and associated mechanical, electrical, and lighting.

Details

Middle/Senior High School, New Construction.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents