Similar Projects
Capital Commerce Center
New Construction, Demolition - 1,100,000 SF
Conception
$30,000,000 est. value
Sacramento, CA 95824

Life Storage Expansion
New Construction - 55,367 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Elk Grove, CA 95624

Greenspace Self Storage
New Construction - 135,228 SF
Design
$10,000,000 CJ est. value
Elk Grove, CA 95624

B.E.S.T. for Autism Office and Storage Buildings
New Construction - 11,460 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Manteca, CA 95336

Public Storage Pleasanton
New Construction - 210,619 SF
Bidding
$10,000,000 CJ est. value
Pleasanton, CA 94566

500 Westridge Drive Seismic Upgrade Project
Renovation - 119,377 SF
Bidding
$40,000,000 est. value
Watsonville, CA 95076

Expansion of Existing Food Bank Warehouse 3
Addition
Post-Bid
Bakersfield, CA 93307

Foothill High School CTE Workshop Building
Renovation
Post-Bid
$200,000,000 est. value
Pleasanton, CA

Design-Build Project-Tech Park Phase 2
New Construction
Results
$6,750,000 est. value
San Luis Obispo, CA 93405

Public Works Loma Rica Maintenance Yard
New Construction - 1,380 SF
Results
$1,500,000 est. value
Loma Rica, CA 95901

Extra Space Storage
New Construction - 26,721 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
La Quinta, CA 92253

Amazon Delivery Station
Renovation - 202,421 SF
Construction
Moorpark, CA 93021

MarBorg Industries Storage Facility
New Construction - 3,151 SF
Pending Verification
$500,000 to $1,000,000 CJ est. value
Santa Barbara, CA 93103

Second Harvest of Silicon Valley Headquarters
New Construction - 250,000 SF
Pending Verification
$10,000,000 CJ est. value
San Jose, CA 95134

Liberty Storage
Renovation - 144,332 SF
Conception
Lodi, CA 95240

Last Updated 06/13/2022 02:04 PM
Project Title

Sorma USA

Physical Address View project details and contacts
City, State (County) Visalia, CA 93291   (Tulare County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method General Contractor to Subcontract.
Project Status Construction Documents
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of a 12,700 square foot pre-manufactured metal building addition. As of June 1, 2022, the site plan is in review and under approval. A firm construction timeline has not been obtained. Interested parties should contact the general contractor. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details: however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Warehouse/Storage, 12,700 SF Addition.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents