Similar Projects
Utilities
Infrastructure
Conception
$81,370 CJ est. value
Ada, OK 74820

Pavement Rehabilitation - SH 1
Infrastructure
Design
$1,500,000 CJ est. value
Ada, OK 74820

ICDBG Sulphur Youth Activity Center
New Construction, Infrastructure
Bidding
$3,500,000 CJ est. value
Ada, OK 74820

RFQ Construction Manager at Risk - Sports Complex Expansion and Multi-use Center
Addition, Demolition, Infrastructure, Renovation - 75,000 SF
Bidding
$60,000 CJ est. value
Ada, OK 74820

Overlay Road Project for Three (3) Miles on Thomas Ranch Road (Pontotoc County District #1
Infrastructure
Post-Bid
$850,000 CJ est. value
Ada, OK 74820

Irving Center Exercise Pad and Walking Trail
Infrastructure
Post-Bid
$80,000 CJ est. value
Ada, OK 74820

Water Line Improvements
Infrastructure
Results
$1,453,390 CJ est. value
Francis, OK 74844

Early Site Package for a Future Elementary School
Infrastructure
Results
$878,894 CJ est. value
Ada, OK 74820

Take 5 Oil Change / Ada
New Construction, Infrastructure - 1,423 SF
Construction
$1,200,000 CJ est. value
Ada, OK 74820

Hayes School Replacement - 2021 Bond - Ada City School District
New Construction, Infrastructure
Pending Verification
$37,000,000 CJ est. value
Ada, OK 74820

New Structure on North End of Property
New Construction, Infrastructure
Post-Bid
$700,000 CJ est. value
Ada, OK 74820

2022 CDBG-CR Community Center
New Construction, Infrastructure
Results
$543,000 CJ est. value
Francis, OK 74844

Parking Expansion Ada Readiness Center
Infrastructure
Post-Bid
$1,761,705 CJ est. value
Ada, OK 74820

Pavement Rehabilitation (A.C. And P.C.) Cleet Facility
Infrastructure
Results
$3,999,333 CJ est. value
Ada, OK 74820

Kiwanis Save the Train
Infrastructure, Renovation
Post-Bid
$200,000 CJ est. value
Ada, OK 74820

Last Updated 10/17/2023 09:13 AM
Project Title

Construction of a 40' X 60' X 14' Sheet Metal Building for Homer VFD

Physical Address View project details and contacts
City, State (County) Ada, OK 74820   (Pontotoc County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Site Development, Warehouse/Storage
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $128,630 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Bid #3 - Construction of a 40' x 60' x 14' sheet metal building for Homer VFD (re-bid of FY 22-23 Bid #29) This work will be performed according to the project specifications provided for this project. The proposal will include a special provision with reference to the Contractor's Non-Collusion Affidavit and a 5% bid bond in a certified or cashier's check or surety bond shall accompany the sealed proposal of each bidder. Evidence of having proper worker's compensation coverage for employees as provided by Title 85 of the Oklahoma Statutes Section 61 shall be required prior to issuance of a work order. Upon award of the contract to a successful bidder, the Contractor will commence work under this contract within forty-five (45) days. Pontotoc County reserves the right to reject any or all bids. Bidder questions concerning this proposal will be accepted at that time. Non-attendance by any potential bidder will result in the disqualification of said bidder at bid opening

Details

38,640 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents