Similar Projects
Bond Project - New Charles Hackley Middle School - Muskegon Public Schools
New Construction, Infrastructure
Design
$30,000,000 CJ est. value
Muskegon, MI 49440

Dollar General / Muskegon
New Construction, Infrastructure - 10,640 SF
Design
$3,000,000 CJ est. value
Muskegon, MI 49442

RFQ Engineering - Lake Harbor Pathway Engineering Services
Infrastructure
Bidding
$400,000 CJ est. value
Norton Shores, MI 49441

RFQ Engineering - Lake Harbor Pathway Engineering Services
Infrastructure
Bidding
$400,000 CJ est. value
Norton Shores, MI 49441

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Lead Service Line Replacements, Contract 5
Term Contract, Infrastructure
Post-Bid
$950,000 est. value
Muskegon, MI

Water System Improvements, AMI Conversion, Contract 3
Infrastructure
Results
$154,000 est. value
Muskegon Heights, MI

Water System Improvements, 7th and 8th Streets: Oakwood to Summit Amsterdam, Rotterdam, and Summit Avenues, Contract 1
Infrastructure
Results
$3,016,560 est. value
Muskegon Heights, MI

Muskegon Museum of Art Expansion
Addition, Demolition, Renovation, Infrastructure
Construction
$11,200,000 CJ est. value
Muskegon, MI 49440

Adelaide Pointe Condos / Muskegon
New Construction, Infrastructure
Construction
$250,000,000 CJ est. value
Muskegon, MI 49440

Windward Pointe Mixed-Use / Muskegon
Demolition, New Construction, Infrastructure
Pending Verification
$200,000,000 CJ est. value
Muskegon, MI 49441

Adelaide Pointe Hotel / Muskegon
New Construction, Infrastructure
Pending Verification
$27,000,000 CJ est. value
Muskegon, MI 49441

Taco John's / Roosevelt Park
Demolition, New Construction, Infrastructure - 1,957 SF
Design
$600,000 CJ est. value
Muskegon, MI 49441

Hot Mix Asphalt Surfacing, Concrete Curb, Gutter, Sidewalk and Upgrade Sidewalk Ramps, Storm Sewer, Water Main and Pavement Markings on Fleming Street
Infrastructure
Bidding
$540,000 CJ est. value
Muskegon, MI 49445

Horton Park Improvements Phase II
Infrastructure
Post-Bid
$200,000 CJ est. value
Muskegon, MI 49445

Last Updated 10/03/2023 08:07 AM
Project Title

Water Filtration Plant - Beach Street Transmission Main Flow Meter

Physical Address View project details and contacts
City, State (County) Muskegon, MI 49440   (Muskegon County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $92,580 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of furnishing all material and constructing the following: Furnishing and installation of one (1) insertion flow meter on the Beach Street water transmission main (30" Class 200 DIP), including installation of precast flow meter chamber. All associated electrical, controls, instrumentation, and site work. Including all necessary appurtenances and restoration. The Owner reserves the right to reject any or all bids and to waive any irregularities in bidding. No bid may be withdrawn after the scheduled closing time for receiving bids for at least one hundred twenty (120) days thereafter

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents