Similar Projects
North Beach Area Primary Access - 18033A - City of Corpus Christi
New Construction, Infrastructure
Conception
$1,025,000 CJ est. value
Corpus Christi, TX 78409

North Beach Area Primary Access - 18033A - City of Corpus Christi
New Construction, Infrastructure
Conception
$1,025,000 CJ est. value
Corpus Christi, TX 78409

Kram ST New Warehouses
New Construction, Infrastructure - 16,000 SF
Design
$2,275,000 CJ est. value
Corpus Christi, TX 78413

Kram ST New Warehouses
New Construction, Infrastructure - 16,000 SF
Design
$2,275,000 CJ est. value
Corpus Christi, TX 78413

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Bldg 1869 Concrete at NAS Corpus Christi, TX
Term Contract
Post-Bid
Less than $250,000 est. value
Corpus Christi, TX

Agriculture Complex Meat Lab Parking Lot
Alteration
Post-Bid

Paving/Concrete
Term Contract
Results
Corpus Christi, TX

South Campus Pedestrian Bridge and Multi Use Trail
New Construction, Infrastructure
Results
$596,340 est. value
Corpus Christi, TX 78404

Superior Trailer
New Construction, Infrastructure - 12,250 SF
Construction
$2,014,000 CJ est. value
Corpus Christi, TX 78406

Quick Quack Car Wash - Fancy Pant
Addition, Demolition, Build-out, Infrastructure - 4,432 SF
Construction
$300,000 CJ est. value
Corpus Christi, TX 78411

Port Aransas Hotel And Conference Center
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Port Aransas, TX 78373

Seawater Desalination Plant - E15117 - City of Corpus Christi
New Construction, Infrastructure
Pending Verification
$188,570,000 CJ est. value
Corpus Christi, TX 78401

Car Rental Ready Return Parking Lot - 23101 - City of Corpus Christi
Infrastructure
Conception
$675,000 CJ est. value
Corpus Christi, TX 78406

Last Updated 12/07/2022 06:14 AM
Project Title

Gollihar Road (Greenwood Drive to Crosstown Expressway) Bond 2018

Physical Address View project details and contacts
City, State (County) Corpus Christi, TX 78411   (Nueces County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $10,143,243 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Corpus Christi (City or Owner) hereby issues this request for bids (RFB). The City is seeking bids from firms interested and qualified in street reconstruction and infrastructure improvements. The work will be performed on Gollihar Road from Greenwood Drive to Crosstown Expressway Corpus Christi, Nueces County Texas. The solicitation consists of two base bids, Base 1 HMAC and Base 2 Concrete. Bidders are allowed to bid one or the other, or both options. The work is to be substantially completed within 630 days. June 22, 2022 by 4:00 PM (CT) Requests for Clarification from Bidders are due Scope of Work: The project scope of improvements includes the complete reconstruction of Gollihar Road from Greenwood Drive to Crosstown Expressway, a distance of 3,900. In addition to surface improvements, the project includes stormwater, water, wastewater, and gas infrastructure improvements. The existing roadway will be demolished and rebuilt with new pavement, curb and gutter, sidewalks, ADA compliant curb ramps, signage, pavement markings, RTA improvements, street light improvements, and traffic and pedestrian signal improvements. Stormwater improvements include the replacement of all curb inlets, deficient reinforced concrete pipes and concrete structures, and all corrugated metal pipes. Water improvements include the replacement of the existing 12 asbestos concrete pipe (ACP) with 12 C900 PVC. Wastewater improvements include approximately 1,725 LF of wastewater pipebursting from the upstream end east of Falkinson to the downstream end just east of Bernandino. Additionally, the scope of wastewater improvements includes removal of an existing wastewater manhole, rehab of eight (8) existing wastewater manholes with fiberglass liners, installation of new 8 SDR 26 PVC wastewater line, and installation of a steel cased wastewater line though a storm junction box. Wastewater improvements include the replacement of the existing wastewater line crossing Gollihar at about mid-Project Limits. Gas infrastructure improvements include conflict resolution and installation of a new 8 gas line from Greenwood to Crosstown Expressway, to be installed by the Citys gas department. Contractor shall perform all utility improvements and upgrades thru related coordination with the City and private utility owners. Two pavement options will be considered, Base Bid 1 Hot Mix, Asphalt (HMAC) and Base Bid 2 Concrete Pavement. Contractors may bid either one or both options, all in accordance with the project specifications and plans.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents