Similar Projects
Construction of Lincoln Road District Improvements
Post-Bid
Miami Beach, FL

Morgan's Glen Phases 1 and 2 (Site Civil) and Phase 3 (Earthwork)
Post-Bid
Sarasota, FL

Palmetto Park Road from Southwest 7th Avenue to Southwest 5th Avenue
Results
Less than $4,950,000 est. value
FL

Resurfacing Group 17-18
Results
Less than $4,950,000 est. value
FL

AutoNation Vehicle Storage Lot - Parking Area Upgrades
Construction
$750,000 est. value
Orlando, FL 32807

Construction Services for Poitras East Community Development District
Post-Bid
FL

Portland Cement and General Contractor
Results
Less than $14,102,991 est. value
FL

Thompson Valley Road Resurfacing Project
Results
Less than $1,100,000 est. value
Monticello, FL

NE 2nd Way Roadway Improvements
Results
Trenton, FL 32693

Smith Creek Road Widening and Resurfacing Project
Results
Crawfordville, FL 32327

FDOT SCOP 2019 Carter Rd./NE 1st St. Roadway Improvements
Results
Less than $450,000 est. value
Lawtey, FL

Silver Springs Acres Road Grading
Term Contract
Results
Less than $38,000 est. value
FL

CR 236 Widening and Resurfacing
Results
Less than $693,313 est. value
FL

Bayou Drive Shoulder Repair
Results
FL

NW 32nd Ave Resurfacing
Results
Less than $900,000 est. value
FL

Last Updated 01/07/2021 07:34 PM
Project Title

1st Street and Bertha Street Roadway Improvements Project

Physical Address View project details and contacts
City, State (County) Key West, FL 33040   (Monroe County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Scope of Work consists of Roadway, Drainage and Improvements. This project is partially FDOT Small County Outreach Program (SCOP) funded and therefore requires adherence to the SCOP agreement and FDOT construction standards. The project is primarily on 1st Street and Bertha Street which are County owned roads in the City of Key West (City) jurisdiction. Contractor shall coordinate with the City for Maintenance of Traffic) MOT permit. The project includes drainage installation and rehabilitation including pipe wall restoration, roadway reconstruction, section of black base construction, milling, overlaying existing road surfaces with asphaltic concrete pavement, re-grading roadway shoulders, sidewalk reconstruction, pavement markings, signage, water utility replacements, and other roadway construction as shown on the Drawings and included in the Technical Specifications. Provide all labor, supervision, materials, supplies, equipment, tools, construction equipment, transportation, inspection, and proper execution and completion of all Work as specified in the Project Manual included in this Bid Package.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents