Similar Projects
Roof Replacement
Renovation
Design
$686,000 CJ est. value
Cottage Grove, TN 38224

Tear Off and Replacement of Roofs for Paris Elementary School
Renovation
Design
$200,000 CJ est. value
Paris, TN 38242

TCAT Roof Replacements - Statewide Crossville Campus Administration & Trucker Buildings
Renovation
Sub-Bidding
$90,000 CJ est. value
Crossville, TN 38555

Re-Roofing Buildings - South Hills Estates
Renovation
Sub-Bidding
$400,000 CJ est. value
Elizabethton, TN 37643

City Hall & Election Commission Office Roof Replacement
Alteration
Post-Bid
Rutledge, TN 37861

Pool and Pump House Buildings Roof Replacement
Alteration
Post-Bid
Bolivar, TN 38074

EMS Station 2 Roof and Ceiling Repairs
Results
Red Boiling Springs, TN 37150

Camden Central HS Reroofing & HVAC
Results
Camden, TN 38320

ROOFING PROJECTS at FOUR SCHOOL LOCATIONS
Renovation
Sub-Bidding
$750,000 CJ est. value
Jackson, TN 38301

Roof Replacement
Alteration
Post-Bid
Nashville, TN 37246

Big Sandy High School - Reroofing and HVAC
Results
Big Sandy, TN 38221

Sundquist Building Roof Replacement
Renovation
Sub-Bidding
$200,000 CJ est. value
Fayetteville, TN 37334

Install Retro-R Panel on the Roof of the City Hall Building
Alteration
Post-Bid
Harrogate, TN 37752

City Hall / Fire Station #1 / Police Station Reroofing
Results
Brownsville, TN 38012

Ripley Housing Authority - Roof Replacement Center Pointe Apartments Gallaway
Renovation
Sub-Bidding
$300,000 CJ est. value
Gallaway, TN 38036

Last Updated 03/14/2023 04:06 PM
Project Title

Tennessee Fire Service and Codes Enforcement Academy (TFACA) Roof Replacement Project

Physical Address View project details and contacts
City, State (County) Bell Buckle, TN 37020   (Bedford County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

1. Contractor shall remove all existing roofing material being replaced and haul-away. 2. Install a new insolation board. (No gaps greater than ¼” to bring the building up to code). 3. Install an approved fully adhered black EPDM roof 60 mil using adhesive to attach the entire roof membrane to the underlying insulation coverboard. 4. Install new coverboard that meets the Manufacture suggested material, specifications, and adhering techniques. 5. Replace metal flashing and ensure membrane goes up to a sufficient height under the metal to comply with manufacture warranty. Ensure no areas of penetration. (Picture 1-2) 6. The contractor is responsible for making sure roof substrate has adequate rigidity, or anchoring points for the roof system and check for any high and low spots in the roof which could cause water pooling. And if not shall fix as appropriate. 7. Flashing, trim, closures strips, caps and similar metal components shall not be less than the minimum thickness as specified by manufacturer and match panels or trim in finish. 8. Install a 6” K style gutter system with downspout that will connect to existing drain to the location of the pump maintenance side of the roof to allow for adequate drainage so that water will not pool up on the roof. (Picture 6-7) 9. All color selections to be determined by TFACA and approved by the Facilities Management. 10. All material substitutions must be pre-approved. 11. All materials shall be installed per manufacturer’s recommendation and best practice. 12. Provide a rollway to collect garbage and remove debris. 13. Price of delivery, haul-away, and garbage shall be considered in the bid price. On-Site work shall be performed between contract award and June 15, 2023, unless an exception is granted by the State contacts listed below. Written Questions & Comments Deadline: Submit no later than March 22, 2023, by 2:00 p.m. CT

Details

7,800 SF.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents