Similar Projects
Midway Heights Elementary RTU Replacement
Renovation
Sub-Bidding
$400,000 CJ est. value
Columbia, MO 65202

Wood Utility Poles
Alteration
Post-Bid
Columbia, MO

RFP D/B - Landfill Gas Plant Engine-Generator (Design Build)
Renovation
Post-Bid
$400,000 CJ est. value
Columbia, MO 65202

Three Phase Pad Mounted Transformers
Term Contract
Results
Columbia, MO

Hickman High Theatre Lighting Upgrade
Alteration
Results
Columbia, MO 65203

Downtown Dimmable Lighting Controls
Alteration
Post-Bid
Columbia, MO

Rebuilt or Reconditioned Single Phase Distribution Transformers
Alteration
Results
Columbia, MO

Electric Power Cable
Term Contract
Post-Bid
Columbia, MO 65203

General Site - Relocate Telecom Ductbank
Alteration
Results
$440,000 to $490,000 est. value
Columbia, MO

Outdoor Power Circuit Breakers
Term Contract
Post-Bid
Columbia, MO 65203

Energy Management Various Trades Blanket Contract
Alteration
Results
$975,000 est. value
Columbia, MO

Single Phase Rebuilt Transformers
Term Contract
Post-Bid
Columbia, MO 65203

Wan Fiber Services to Cedar Ridge Elementary
Term Contract
Post-Bid
Columbia, MO 65201

Generator Inspection and Maintenance Services
Term Contract
Post-Bid
Columbia, MO 65203

Low Voltage Wire Installation
Renovation, Term Contract
Post-Bid
$140,000 CJ est. value
Columbia, MO 65203

Last Updated 06/29/2023 06:38 AM
Project Title

Power Plant - Turbine Generator 10 Installation Project

Physical Address View project details and contacts
City, State (County) Columbia, MO 65201   (Boone County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $3,329,341 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

SCOPE OF WORK a. The Contractor shall furnish all labor, materials, tools, equipment necessary for, and incidental to, construction of this project as indicated on Drawings and specified herein. b. Work shall include everything requisite and necessary to finish work properly, notwithstanding that every item of labor or materials or accessories required to make project complete may not be specifically mentioned. c. General Description of Work: (5) Demolition shall consist of: (a) Existing Turbine Generator 6, its condenser, and related equipment (b) Piping SC - 3 (c) Structural Steel (d) Concrete Pads (e) Miscellaneous electrical including existing lighting, out-of-service cables, raceway, and devices. (f) A hazardous material survey has been conducted in the project work area. Refer to the survey report provided as a reference document for findings. (g) Some asbestos containing material was discovered in the project area, however, it is not anticipated asbestos containing material will be disturbed during demolition or construction of this project. (h) Some RCRA metal containing materials (paint) were discovered. Some of these materials are expected to be removed for demolition and construction of this project. Refer to Division 02 for requirements. (i) Contractor shall protect equipment and operating facility during construction from weather. (6) Structural work shall consist of : (a) Existing turbine foundation modifications. (b) Equipment maintenance pads. (c) Operating floor framing modifications. (7) Electrical work shall consist of: (a) Installation of Generator 10 and related equipment (b) Existing electrical system modification. (c) Existing switchgear upgrade. (d) Installation of a new Motor Control Center. (e) Installation of a new Automatic Transfer Switch. (f) Support commissioning of electrical systems and equipment. (8) Instrumentation & Controls work shall consist of: (a) Furnish and install instruments as defined in the instrument list (b) Install and wire the Turbine Control System (c) Calibrate instruments SC - 4 (d) Support commissioning of control systems (9) Mechanical work shall consist of: (a) Installation of Turbine Generator 10 and related equipment (b) Procurement and installation of miscellaneous pumps (c) Piping (10) Major Equipment Rigging shall consist of: (a) Develop rigging plans for the installation of major components for review. (b) Develop shoring plans as required for the existing operating floor and exterior tunnels. Exhibit B includes a previous shoring plan for the tunnels located along fifth street. Contractor shall utilize this plan for locations of existing tunnels. (c) Rigging and shoring plans shall be submitted for review and approval prior to commencing work. 4. LOCATION a. Work shall be performed under this Contract on campus of the University of Missouri - Columbia, at the University Power Plant at the Northwest corner of Fifth street and Stewart street.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents