Similar Projects
Bluffs of South Haven Condominium Association - Shoreline Protection Project
Renovation - 490 SF
Design
South Haven, MI 49090

Gdrra - Demolition Services At The Waste Energy Facility
Demolition
Bidding
Detroit, MI

Summer 2022 Sitework
Infrastructure
Bidding
Roseville, MI 48066

Bavarian Inn Lodge - Flood Plain
Renovation
Post-Bid
Frankenmuth, MI 48734

Environmental Abatement of Asbestos and Hazardous Materials, Demolition and Disposal of 817 North Stevenson Street
Post-Bid
Flint, MI 48500

Environmental Abatement and Disposal of Asbestos and Hazardous Materials and Demolition and Disposal of Residential and Commercial Structures in Genesee County
Demolition
Results
Flint, MI 48502

Demolition of Vacant Elementary Building
Demolition
Results
White Cloud, MI 49349

Covenant Health Center
New Construction - 24,000 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Detroit, MI 48228

PNC Bank Branch No. B605
Renovation
Construction
Kentwood, MI 49508

Bid Package No. 7 Miscellaneous Improvements at Various Schools
Infrastructure, Alteration
Bidding
Lincoln Park, MI 48146

Residential Site Development
Post-Bid
Hamtramck, MI 48212

Michigan Reformatory - Boiler 2 Hazardous Materials Abatement and Demolition
Results
Ionia, MI 48846

PNC Bank Branch No. B703 Cascade
Renovation
Construction
Grand Rapids, MI 49546

Demolition of 1 House
Demolition
Bidding
Kalamazoo, MI 49001

Demolition of House at 23090 Stewart
Demolition
Post-Bid
Warren, MI 48093

Reported 03/31/2022 12:00 AM
Project Title

KSZ Spartan Chemical - Remedial Excavation

Physical Address View project details and contacts
City, State (County) Wyoming, MI 49519   (Kent County)
Category(s) Heavy and Highway
Sub-Category(s) Demolition, Site Development
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Soil erosion and sedimentation controls, site security until the work is complete, surfactant and foam application to minimize VOC emissions while performing the work; excavation to the water table, as specified in the contract documents; loading, hauling, and disposal of impacted soil, loading, hauling, and recycling concrete and asphalt. The work includes demolition and disposal/recycling of two buildings and their contents. The work includes supporting the adjacent offsite building to the south with push-piles and providing temporary excavation support with a pre-engineered slide rail system along the eastern, southern, and western excavation limits as indicated in the drawings. The work includes locating, support, relocation, and/or replacement of utilities that may traverse the work area. The work includes backfilling and compacting the excavation.

Details

Division 02 - Existing Conditions, Subsurface Investigation, Demolition.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents