Similar Projects
2021 Provo City Streets Road Rehabilitation
Post-Bid
Provo, UT

2021 Roads Project
Post-Bid
Lehi, UT

2019 Overlay Project
Results
Less than $294,507 est. value
Alpine, UT 84004

700 South Overlay Project
Results
Less than $300,000 est. value
Pleasant Grove, UT 84062

Low Book Sales Dealership Expansion
New Construction, Alteration
Pending Verification
Lindon, UT 84042

Otteson Subdivision Street Improvements
Alteration
Pending Verification
Salem, UT 84653

Airport Road Traffic Signal - New Roadway and Intersection
Post-Bid
Eagle Mountain, UT

2021 Provo City Streets Crack Seal Project
Results
$150,000 to $200,000 est. value
Provo, UT 84606

Red Bridge - Pid Super Pad
Alteration
Pending Verification
Orem, UT

Udot AVL (Approved Vendor List)- Hot Mix Asphalt
Term Contract
Post-Bid

2020 Crack Seal Project
Results
$350,000 est. value
Orem, UT 84057

2021 Roadway Paving Project
Infrastructure
Post-Bid
Woodland Hills, UT

Art Dye Roundabout
Results
Less than $326,686 est. value
American Fork, UT

Y--Price Canyon Recreation Site Road Improvements
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

2021 Provo City Streets Rehabilitation Project
Results
Less than $2,000,000 est. value
Provo, UT

Reported 04/16/2022 12:00 AM
Project Title

400 South Mill And Overlay - 1300 East To 1950 East

Physical Address View project details and contacts
City, State (County) Springville, UT   (Utah County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $1,200,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Part A: Full profile mill and overlay of 400 South Street from 1300 East to 1950 East including the entire roundabout. Work shall consist of a 1.5 inch profile mill of the entire roadway, placement of a ½” asphaltic leveling course, placement of a geotextile interlayer (in travel lanes), placement of a 2-inch overlay over the entire roadway surface, and the lowering, raising and collaring of existing manholes and water valves in the project area. The project will also include the complete removal and replacement of approx. 1550 SF of asphalt complete, and the placement of approx. 3220 SF of 8-inches of base and 4-inches of asphalt. Part B: Edge mill and overlay of Meadowlark Lane from 1000 East to Canyon Avenue. Work shall include an 8-feet wide edge mill to 1.5 inches below lip of gutter along the perimeter of the project limits, placement of a ½” asphaltic leveling course, and placement of a 2-inch overlay over the entire roadway surface, the lowering, raising and collaring of existing manholes and water valves in the project area. Part C: Construction of an approx. ½ acre asphalt parking area at the wastewater treatment plant (700 N 500 East). Work shall include the removal of existing asphalt driveway and saw cutting existing asphalt edge with off-site disposal, remove, survey and grade soil down 9-inches and dispose on-site, build a 2-ft high berm on the west side with the deleterious material, place 6-inches base and 3-inches asphalt concrete.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents