Similar Projects
Dar Alnoor Expansion
Renovation, Addition - 76,276 SF
Conception
Manassas, VA 20122

Auditorium Structural Repairs at Northampton High School
Post-Bid
$10,000 est. value
Machipongo, VA

Original Mount Vernon High School Renovation and Adaptive Reuse - CMAR
Renovation
Post-Bid
$55,000,000 est. value
Alexandria, VA 22309

Elkhardt-Thompson (Hull Street) Middle School Project
New Construction - 170,600 SF
Results
$50,000,000 est. value
Richmond, VA

Construction Management for the Expansion and Renovation of Forest Middle School
Renovation, Addition - 75,000 SF
Results
Less than $25,700,000 est. value
Forest, VA 24551

High School HS-11 Project - Independence High School
New Construction - 282,000 SF
Construction
$90,000,000 est. value
Ashburn, VA

Stonewall Middle School Addition and Renovations
Renovation, Addition - 41,024 SF
Construction
$17,100,000 est. value
Manassas, VA

Design-Build Project - William Byrd High School Renovation
New Construction, Renovation - 113,500 SF
Post-Bid
$15,000,000 to $20,000,000 est. value
Vinton, VA 24179

Replace HVAC and Remodel Front Offices at Grafton HS and MS
Results
Yorktown, VA 23692

Henley Middle School Modernization and Security Addition
Renovation, Addition - 11,400 SF
Construction
$1,250,000 to $1,900,000 est. value
Crozet, VA 22932

Renovation of School Based Health Care Clinic
Renovation - 1,185 SF
Post-Bid
Petersburg, VA

General Contractors for On-Demand Construction Services for Spotsylvania County Public Schools
Term Contract
Results
$400,000 to $5,000,000 est. value
Fredericksburg, VA 22407

George Washington Middle School Cafeteria Renovation General Contractor
Renovation
Construction
Alexandria, VA 22301

New Consolidated Middle/High School Complex
- 347,949 SF
Results
$156,210,000 est. value
Boydton, VA 23917

New Pulaski County Middle School Construction
New Construction - 163,350 SF
Construction
$47,000,000 est. value
Pulaski, VA 24301

Reported 12/11/2019 12:44 PM
Project Title

J.R. Tucker High School

Physical Address View project details and contacts
City, State (County) Henrico, VA 23294   (Henrico County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method
Project Status Construction Commenced November 2019, Construction Completion Expected September 2021
Bids Due View project details and contacts
Estimated Value $80,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of the construction of an approximately 260,000sf new high school and associated sitework co-located on the site of the existing J.R. Tucker High School and the demolition of the existing J.R. Tucker High School. The new high school building consists of a structural system with a combination of load-bearing CMU and steel framing. Interior partitions include CMU, drywall and limited amounts of wood veneer paneling. Flooring includes polished concrete, carpet tile, wood sports and stage flooring and rubber floor tile. Roofing systems include EPDM membrane and pre-finished, standing-seam metal roofing. Building features include kitchen with food service equipment, dining commons, a 3-court gymnasium, 1,100 seat auditorium, library, general classrooms, career technical and technology areas, and administration areas. Site construction includes the construction of a new bus loop and bus canopy and new parking area including all grading, erosion and sediment control, stormwater management, site utilities, driveways, paving and sidewalks, fencing, site lighting, signage and landscaping. The site work also includes a methane venting system under the building pad of the new high school. New athletic facilities include a new football stadium with an 8-lane track and synthetic turf field, including grandstands and press box, new concessions building and new fieldhouse. Phase 1: The construction of the new high school, bus loop and canopy and partial site work and parking areas as indicated in the Contract Documents. completed by August 1, 2021. The existing high school will be occupied and remain in operation during the entire period of construction. Phase 2: The demolition of the existing high school and associated sitework, the construction of the new fieldhouse building, concessions building, football stadium, grandstands, press box and the balance of sitework and parking completed by June 1, 2022. The new high school will be occupied and remain in operation during the entire period of this phase.

Details

1 Middle/Senior High School, Approximately 260,000 SF New Construction.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents