Similar Projects
Hope Downtown Streetscaping (Tap-19) (S)
Infrastructure
Bidding
$500,000 to $700,000 est. value
Hope, AR

Concrete Repair for Street Parking Lot
Infrastructure
Bidding
$100,000 to $250,000 est. value
Little Rock, AR

Shannon Hills Safe Routes to School - Sidewalks
Post-Bid
Alexander, Shannon Hills, AR 72002

EACC Truck Driving Range
Infrastructure
Post-Bid
$125,000 est. value
Forrest City, AR 72335

New Walking / Biking Trail on the Campus of ASU-MTN
Results
Mountain Home, AR

I-40 Truck Parking Expansion Project (West Memphis)
Results
AR

Slaughter Pen West Parking
Renovation, Infrastructure
Pending Verification
Bentonville, AR 72712

Ramsey Village Apartments
New Construction, Alteration
Pending Verification
$21,000,000 est. value
Fayetteville, AR 72704

Sulphur Creek Trails - Phase I
Infrastructure
Bidding
$500,000 est. value
Heber Springs, AR

Natural Surface Trail Services
Infrastructure
Post-Bid
Rogers, AR

2021 Paving Program, Paving of Miscellaneous Street, Trails and Parking Lots
Results
Less than $1,000,000 est. value
Searcy, AR

Construction Manager at Risk - Midtown Corridor
Infrastructure
Bidding
$400,000 est. value
Fayetteville, AR

Pavement Rehabilitation for North Heights School Parking Lot
Infrastructure
Post-Bid
$230,000 est. value
Texarkana, AR

Bryant Parkway Trail
Results
Bryant, AR

Construct a Parking Lot at the Blytheville Elementary School
Infrastructure
Bidding
$300,000 est. value
Blytheville, AR 72315

Last Updated 06/24/2022 08:42 AM
Project Title

Bull Shoals Hwy 178 Sidewalk Project

Physical Address View project details and contacts
City, State (County) Bull Shoals, AR 72619   (Marion County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

For the construction of a 5' wide concrete sidewalk along Highway 178

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents