Similar Projects
Lake Hammer Pump Station - City of Apopka
Renovation
Conception
$250,000 CJ est. value
Apopka, FL 32712

Utilities Pump Station Improvements Package 34
Renovation
Bidding
$4,359,668 CJ est. value
Orlando, FL 32801

Vick Road Wastewater System Force Main Upgrade
Infrastructure
Bidding
$3,000,000 CJ est. value
Apopka, FL 32712

Bill Frederick Park Lift Stations Upgrades
Renovation
Post-Bid
$1,120,000 est. value
Orlando, FL

Grease Traps and Lift Station Cleaning, Maintenance, and Repair
Renovation, Infrastructure
Post-Bid
Orlando, FL 32819

Orange County Utilities Pump Station Package 40
Results
$2,068,770 est. value
FL

Utilities Pump Station Improvements Package 24
Results
$2,160,127 est. value
Belle Isle, Orlando, FL 32812

Lake Lawne Rsf Weir Gate Retrofit Barnett Park
Infrastructure
Post-Bid
$467,700 CJ est. value
Orlando, FL 32808

Utilities Pump Station Improvements Package 32
New Construction
Results
$3,655,000 est. value
Orlando, FL

Upgrade to Existing Transfer Pump Station and Upgrade to Existing Reuse Pump Station
Renovation
Post-Bid
$2,000,000 CJ est. value
Ocoee, FL 34761

South Water Reclamation Facility North Plant Effluent Pump Station Pre-Engineered Building
New Construction
Results
$2,111,384 est. value
Orlando, FL 32819

Southwest Marriott Pump Station Odor Control System
New Construction
Results
$1,191,680 est. value
Orlando, FL 32885

Utilities Pump Station Improvements Package 34
Renovation
Results
$2,315,584 est. value
Orlando, FL

Refurbish and Upgrade the Unit 2 Pump Station
Renovation
Results
$350,000 est. value
Apopka, FL 32704

Oakland Lift Station No. 6 and Force Main Improvements
Renovation, Infrastructure
Results
$475,200 est. value
Oakland, FL 34760

Last Updated 02/10/2023 12:09 PM
Project Title

Water Conserv II Water Reclamation Facility Equalizer Pump Station Improvements - City of Orlando

Physical Address View project details and contacts
City, State (County) Orlando, FL 32801   (Orange County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Design Development, Request for Qualifications, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $2,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of February 10, 2023, an award has been made for this solicitation. A timeline for construction has not been determined. Closed solicitation has been included below for reference. ............ Pursuant to Section 287.055, Florida Statutes, and the policies and procedures of the City of Orlando, notice is hereby given that the City is seeking sealed Qualification Statements for RQS22-0040 Water Conserv II Water Reclamation Facility Equalizer Pump Station Improvements Question End Date 12/20/2021 5:00 PM The method of contractor selection has not been determined at this time.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents