Similar Projects
George Washington Carver Park Improvements - Zone B (Re-Bid)
Infrastructure
Design
$300,000 CJ est. value
New Orleans, LA 70118

Harold Gene Devore Playground
Infrastructure
Design
$230,000 CJ est. value
New Orleans, LA 70114

Construction of EV Shuttle Charging Station- Claiborne Parking Lot
New Construction, Infrastructure
Post-Bid
New Orleans, LA

Improvements to Causeway Boulevard and Scott Street Sewer Lift Station
New Construction, Infrastructure
Post-Bid
Gretna, LA

LA 3139: Dickory Avenue - Orleans P/L
Infrastructure
Results
$2,500,000 to $5,000,000 est. value

DPW RR077 Lake Vista Group E
Infrastructure
Results
New Orleans, LA

Broad St - Read Blvd Ped Improvements
Alteration
Design
$1,000,000 to $2,500,000 est. value
New Orleans, LA 70181

RR022 - Central City Group B (PMOPI)
Infrastructure
Post-Bid
New Orleans, LA

RR002- Audubon Group B (PMOPI)
Infrastructure
Results
New Orleans, LA

LA 49 / Williams Blvd Corridor Improvement
Infrastructure
Design
$15,000,000 CJ est. value
Kenner, LA 70065

Stuart Bradley Elementary School - Parking Lot Addition
Infrastructure
Post-Bid
New Orleans, LA

Read Boulevard East Group E (FRC)
Infrastructure
Results
New Orleans, LA

Three 30 Pratt Type Xr-70 150B Butterfly Valves
Infrastructure
Post-Bid
Gretna, LA

Lower Ninth Ward Northwest Group C (FRC)
Infrastructure
Results
New Orleans, LA

Kenner FEMA Street Renovations
Infrastructure
Post-Bid
$1,100,000 est. value
Kenner, LA

Last Updated 12/13/2022 03:11 PM
Project Title

Florence Street Drainage Improvements

Physical Address View project details and contacts
City, State (County) Harvey, LA 70058   (Jefferson County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Cost Estimate: $500k to $1M For the following project: Florence St. Drainage Improvements (Pailet Ave. to Brown Ave. Canal) Public Works Funded by the U.S. Department of Housing and Urban Development under the Hurricane Isaac Community Development Block Grant Disaster Recovery Program and HUD Grant # HMGP-DR (B-13-US-22-0001) The project consists of drainage improvements along Florence St. between Pailet Ave. and Brown Ave. Canal including installation of 54-inch and 60-inch equivalent arch pipe, catch basins, and conflict boxes. Other work includes partial roadway removal and replacement, sidewalk construction, and minor water and sewer modifications due to drainage conflicts. Purchases for this project shall be exempt from state sales and use tax according to La. R.S. 47:301(8)(c)(i). The successful bidder shall be granted the tax-exempt status of Jefferson Parish via Form R-1020, Designation of Construction Contractor as Agent of a Governmental Entity Sales Tax Exemption Certificate. Form R-1020 is distributed by the Louisiana Department of Revenue. All bids must be in accordance with the contract documents on file with the Jefferson Parish Purchasing Department, Suite 4400, Jefferson Parish General Government Building, at 200 Derbigny Street, Gretna, Louisiana. Late bids will not be accepted Each Bid must be accompanied by an electronic bid surety bond in the amount equal to five percent (5%) of the total amount bid, and payable without condition to the owner. Vendors must submit an electronic bid bond through the respective online clearinghouse bond management system(s) as indicated in the electronic bid solicitation on Central Auction House. No scanned paper copies of any bid bond will be accepted as part of the electronic bid submission. The drawings and specifications are on file and open for inspection in the Jefferson Parish Purchasing Department, Suite 4400, Jefferson Parish General Government Building, at 200 Derbigny Street, Gretna, Louisiana. The successful bidder will be required to furnish a performance bond guaranteeing faithful performance of the contract. Companies providing the bonds shall comply with the requirements of LA-R.S. 38:2218 and R.S. 38:2219 as applicable. The Jefferson Parish Council reserves the right to reject all bids and to reject bids for just cause, pursuant to the law. Jefferson Parish and its partners as the recipients of federal funds are fully committed to awarding a contract(s) to firm(s) that will provide high quality services and that are dedicated to diversity and to containing costs. Thus, Jefferson Parish strongly encourages the involvement of minority and/or woman-owned business enterprises (DBEs, including MBEs, WBEs and SBE) and Business Concerns to stimulate participation in procurement and assistance programs Furthermore, failure to attend the pre-bid conference and inspection does not relieve the successful bidder from the necessity of furnishing materials or performing any work that may be required to complete the work in accordance with the specification with no additional cost to the owner. This project is funded by a Community Development Block Grant (CDBG) from the U.S. Department of Housing and Urban Development (HUD) and shall be subject to CDBG and HUD requirements. The attention of bidders is called particularly to the requirements for conditions of employment to be observed and minimum wage rates to be paid under the Contract (Davis Bacon Act), Section 3 (Low Income Resident Participation) of the Housing and Community Development Act of 1968, Section 109 (Non-Discrimination) of the Housing and Community Development Act of 1974, Section 503 (Non-Discrimination Against Employees with Disabilities) and Section 504 (non-discrimination against individuals with disabilities) of the Rehabilitation Act of 1973, Segregated Facilities, Executive Order 11246, and all applicable laws and regulations of the Federal Government and State of Louisiana and bonding and insurance requirements. All contractors and subcontractors shall comply with Title VI of the Civil Rights Act of 1964, the Davis Bacon Act, the Anti-Kickback Act, and Contract Work Hours and Safety Standards Act. The federal funding agency for this project requires that all bonds are to be written by a surety or insurance company currently on the U.S. Department of the Treasury Financial Management Service list (Circular 570) of approved bonding companies which is published annually in the Federal Register. Each bidder must have an active Unique Entity ID, as verified prior to beginning of construction. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents