Last Updated 04/21/2022 08:20 AM
Project Title

Reconstruction/Rehabilitation

Physical Address View project details and contacts
City, State (County) SC   (Horry County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mobilization 1.000 Ls Bonds And Insurance 1.000 Ls Traffic Control 1.000 Ls Removal & Disposal Of Existing Pavement 4,430.000 Sy Removal & Disposal Of Existing Curb 1,450.000 Lf Borrow Excavation 4,741.000 Cy Excavation For Shoulder Paving 297.792 Sta Hauling Of Excavated Shoulder Material 297.792 Sta Maintenance Stone 299.000 Ton Hma Shoulder Widening Course 1,488.960 Ton Liquid Asphalt Binder Pg64-22 5,552.218 Ton Full Depth Asph. Pav. Patching 8" Unif 1,400.000 Sy Full Depth Asph. Pav. Patching 10"Unif 28,500.000 Sy Milling Existing Asphalt Pavement 2.0" 813,085.000 Sy Milling Existing Asphalt Pavement (Variable) 1,175.000 Sy Milled-In Rumble Strip 45.960 Mi Hot Mix Asphalt Surface Course Type b 99,121.681 Ton Hot Mix Asphalt Surface Course Type d 204.000 Ton Driveway Paving-Surface Type d 811.250 Ton Permanent Construction Signs (Ground Mounted) 4,936.000 Sf 4" White Broken Lines -(Gaps Excluded)-Fast Dry Paint 128,605.000 Lf 6" White Broken Lines -(Gaps Excluded)-Fast Dry Paint 116,400.000 Lf 4" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 178,329.000 Lf 6" White Solid Lines (Pvt. Edge Lines)-Fast Dry Paint 248,535.000 Lf 8"White Solid Lines(Crosswalk&Channelization)Fast Dry Paint 41,520.000 Lf 24" White Solid Lines (Stop/Diagonal Lines)-Fast Dry Paint 35,970.000 Lf White Single Arrow (Left, Straight, Right)-Fast Dry Paint 384.000 Ea White Word Message "Only"-Fast Dry Paint 219.000 Ea White Combination Arrow(Str.& Rt.Or Str.& Lt.)Fast Dry Paint 93.000 Ea 4" Yellow Broken Lines(Gaps Exc) - Fast Dry Paint 39,930.000 Lf 4"Yellow Solid Line(Pvt.Edge&No Passing Zone)-Fast Dry Paint 425,964.000 Lf 6"Yellow Solid Line(Pvt.Edge&No Passing Zone)-Fast Dry Paint 243,000.000 Lf 6" Yellow Solid Line On Curb/Median - Fast Dry Paint 8,765.000 Lf 6" White Broken Lines -(Gaps Excluded) Epoxy Paint 770.000 Lf 6" White Solid Lines (Pvt. Edge Lines) Epoxy Paint 1,595.000 Lf 6"Yellow Solid Lines-Pvt.Edge&No Pass. Zone - Epoxy Paint 1,595.000 Lf 4" White Broken Lines(Gaps Excl.)Thermoplastic- 90 Mil. 42,535.000 Lf 6" White Broken Lines(Gaps Excl.)Thermoplastic- 90 Mil. 38,800.000 Lf 4" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 59,443.000 Lf 6" White Solid Lines (Pvt. Edge Lines) Thermo.- 90 Mil. 82,845.000 Lf 8" White Solid Lines Thermoplastic - 125 Mil. 13,840.000 Lf 12in x 18in White Triang. Yield Bar (Gaps Exc)Thermo-125mil 15.000 Lf 24" White Solid Lines (Stop/Diag Lines)-Thermo.-125 Mil 11,990.000 Lf White Single Arrows (Lt, Strght, Rt) Thermo.-125 Mil. 128.000 Ea White Word Message "Only" -Thermoplastic - 125 Mil. 73.000 Ea White Combination Arrows(Str&Rt.Or Str&Lt)Thermo-125mil 31.000 Ea 4" Yellow Broken Lines(Gaps Exc)Thermoplastic - 90 Mil. 13,310.000 Lf 4" Yellow Solid Lines(Pvt.Edge Lines) Thermo-90 Mil. 141,988.000 Lf 6" Yellow Solid Lines(Pvt.Edge Lines) Thermo-90 Mil. 81,000.000 Lf Permanent Clear Pavement Markers- Mono-Dir.- 4"x4" 5,226.000 Ea Permanent Yellow Pavement Markers Mono-Dir.- 4"x 4" Perm. Yel. 981.000 Ea Permanent Yellow Pavement Markers Bi-Dir.- 4"x4" 1,647.000 Ea Removal Of Pavement Markings 126,637.000 Lf 10' Truss Aluminum Bracket Arm (Mounted On Strain/Mast Pole) 14.000 Ea Furnish & Install 1.0" Schedule 80 Pvc Conduit 930.000 Lf Furnish & Install 2.0" Schedule 80 Pvc Conduit 4,350.000 Lf Furnish & Install 2.0" Schd 80 Pvc Conduit (Direction.Bored) 2,140.000 Lf Furnish & Install No. 14 Copper Wire, 8 Conductor (Gray) 5,550.000 Lf Furnish & Instl No. 14 Copper Wire,1-Conductor For Loop Wire 35,340.000 Lf Sawcut For Loop Detector 13,279.000 Lf f&i-13"x24"x18"d.Elec.Flush Undgrd.Enclos-(Str.Poly.Conc.)Hd 44.000 Ea Temporary Adjustment Of Traffic Signal Equipment 23.000 Ea Furnish & Install Radar For Stop Bar Detection, Inc 150' Cable & Mounting Hardware 44.000 Ea Furnish & Install Cabinet Interface Components For Stop Bar Detection 11.000 Ea Furnish & Install Radar For Setback Detection, Inc 150' Cable & Mounting Hardware 22.000 Ea Furnish & Install Radar Detection Cable To Cross Roadway 14,850.000 Lf Catch Basin t-17 (Convert c.b. Type 5) 49.000 Ea Catch Basin t-18 (Convert c.b. Type 7) 11.000 Ea Concrete Curb And Gutter(1'-6") Vertical Face 450.000 Lf Concrete Curb And Gutter(2'-0") Vertical Face 1,000.000 Lf Concrete Sidewalk(4" Uniform) 550.000 Sy Detectable Warning Material 1,325.000 Sf Concrete Driveway(6" Uniform) 1,230.000 Sy Pedestrian Ramp Construction 2,650.000 Sy Premash Type t Tl3 Leading 50' 1.000 Ea Permanent Grassing For Non-Permitted Resurfacing Projects 17.007 Acr

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents