Similar Projects
Wastewater Treatment Plant
Results
Less than $11,500,000 est. value
Marion, KY

Wastewater Facilities Improvements - Contract A - Sanitary Sewer Rehab And WWTP Modifications - Contract B
Post-Bid
Dawson Springs, KY

Peracetic Acid Disinfection System Improvements
Post-Bid
Sutherland, KY 40004

Wastewater Treatment Plant and Collection System Improvements
Results
Whitesville, KY

Bells Lane WWTF Disinfection System Upgrades
Results
$50,000 to $499,999 est. value
Louisville, KY 40211

Wastewater Treatment Plant Improvements - Phase 1
Post-Bid
Middlesborough, KY

West Hickman WWTP Water Strainer Replacement
Results
Lexington, KY

Replacement of Dewatering Equipment at West Hickman WWTP
New Construction
Post-Bid
Nicholasville, KY 40356

Reported 08/25/2021 12:00 AM
Project Title

Sanitary Sewer Rehabilitation Contract 3

Physical Address View project details and contacts
City, State (County) Elkton, KY   (Todd County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $1,320,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The construction of Wastewater System Rehabilitation and Improvements Contract 3 - Wastewater Treatment Plant Improvements consisting of Installation of New Aeration Equipment in the existing Oxidation Ditch, replacement of the Oxidation Ditch effluent weir gate, construction of a building for sludge dewatering equipment including a dewatering press, progressive cavity sludge pumps, wastewater macerator, polymer blending system, and screw conveyer, installation of a new ultrasonic level sensor on an existing Parshall flume at the WWTP headworks, installation or replacement of yard piping including installation of approximately 263± LF of 6” DI Force Main, installation of 60± LF of 6” PVC gravity sewer, and installation of approximately 100± LF of 2” water main. Additive alternates include replacement of approximately 20± LF of 18” dia. pipe with 12” dia. pipe between the oxidation ditch and the clarifier splitter box, furnishing and installation of an additional screw/drum to double the capacity of the dewatering system, and removal and replacement of an aluminum skirt baffle and supports on Clarifier No. 1 together with all related work.

Details

Sewage Treatment Plant, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents