Similar Projects
First Baptist Church Education Building
New Construction
Design
Charleston, SC

New K8 School
New Construction - 100,000 SF
Design
$30,000,000 est. value
SC 29730

India Hook Elementary School Classroom Addition
Addition
Bidding
Rock Hill, SC

North Central Elementary Subcontractors and Materials Suppliers
Sub-Bidding
Kershaw, SC 29067

Various Renovations to Florence 1 Schools FY21-22 (No.1)
Renovation
Sub-Bidding
Effingham, Florence, SC 29501

Beaufort Elementary School Renovations Construction Management - CM at Risk
Renovation
Post-Bid
Beaufort, SC 29902

Indefinite Delivery Contract - Construction Services
Post-Bid
Charleston, SC 29401

Cherry Park Elementary School Kitchen Upfit
Renovation
Results
Less than $559,000 est. value
Rock Hill, SC 29730

York Road Elementary School Renovations
Renovation
Results
Less than $330,560 est. value
Rock Hill, SC 29732

Hilton Head Christian Academy
New Construction - 93,000 SF
Construction
$15,000,000 est. value
Bluffton, SC

Camp Road Middle School
Construction
Less than $31,497,000 est. value
Charleston, SC 29412

Construction Manager at Risk Services - Robert E. Cashion Elementary School
Post-Bid
Greenville, SC 29605

Construction Management at Risk Services for Capital Improvements Program
New Construction, Renovation
Results
Abbeville, SC 29620

Marshall Primary School Restrooms
Addition - 720 SF
Construction
Belton, SC 29627

Various Renovations to Florence 1 Schools Fy20-21
Renovation
Post-Bid
Florence, SC 29506

Last Updated 06/14/2021 04:19 PM
Project Title

New North Vista Elementary School

Physical Address View project details and contacts
City, State (County) Florence, SC 29501   (Florence County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids. Construction Management - CM at Risk.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Construction Manager At Risk. Projects are renovation and new construction necessary to convert the existing North Vista Elementary School to a middle school and for construction of a new, replacement elementary school. The new elementary school is anticipated to be a two(2) story elementary school of approximately 90,000 square feet, with classrooms,2 offices, science lab,art, music, media center, kitchen, cafeteria and PE gym to be constructed on an approximately 11 acre site for approximately700 students.

Details

1 Elementary School, 90,000 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents