Similar Projects
Last Updated | 10/05/2020 11:11 AM |
Project Title | Y--Construct Clean Core (Va-19-00058573) |
Physical Address | View project details and contacts |
City, State (County) | North Providence, Providence, RI 02908 (Providence County) |
Category(s) | Medical |
Sub-Category(s) | Hospital |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $5,000,000 to $10,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project consists of constructing a new surgery suite space for a Clean Core within and adjacent to the existing operatories, relocate the Cystoscopy suite and minor surgery, add an elevated Clean Core to access operatories and Cystoscopy with sterile supplies directly from the clean core, locate Sterile Supply Core, Instrument Storage, Clean Core Housekeeping Aids Closet and Charge Nurse Office within the Clean Core renovate existing space to relocate the surgery locker rooms adjacent to the surgery suite for pass through access to the surgery suite. Renovations and construction services will be performed measuring approximately 2,900 GSF of existing space in and adjacent to the existing operating room (OR) suite and 3,900 GSF of new space in an elevated second floor addition in Building One, the main hospital building, at the Providence VA Medical Center. Work shall be accomplished as required by drawings and specifications for Project No. 650-337 Construct Clean Core Addition to Surgical Suite. During the construction of the Clean Core, the contractor shall protect the existing buildings and historical structures from any damage from ongoing construction. The Medical Center must maintain its operation 24 hours a day 7 days a week. The existing OR and post anesthesia care unit (PACU) must remain open and accessible at all times during construction. Normal hours of operation of the OR and PACU are Monday through Friday, 6am to 7pm. It is the contractor s responsibility to develop a work plan and a schedule detailing work procedures, equipment and materials, life safety measures, and the duration of work with milestone subtasks. |
||||||||||||||||||||||||||||||||||||||||||||||
Details | ,, 6,800 SF - 1 Hospital, 2,900 SF Renovation, 1 Hospital, 3,900 SF New Construction.
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |