Similar Projects
Last Updated | 03/18/2022 11:23 AM |
Project Title | FY21 USACE Galveston District, Sabine-Neches Waterway (SNWW) Maintenance Dredging, Jefferson County, Texas Pipeline Dredging, Deep Draft |
Physical Address | View project details and contacts |
City, State (County) | Galveston, TX (Galveston County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Dredging |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $5,000,000 to $10,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Schedule No. 1 work consists of dredging areas along the Neches River, MARAD Anchorage Basin, and MARAD Fleet Access Slip. Schedule No.1 dredging includes approximately 3,000,000 cubic yards utilizing Placement Areas 12,13,14,16,17, 23, and 24. Pipeline Length averages between 1mile to 3.5miles Option work includes dredging PA Canal Junction Area, Taylors Bayou area, and USCG Boat Basin. Estimate dredge volume is approximately 2,000,000 cubic yards utilizing Placement Areas 5 and 9. Pipeline Length averages between 1mile to 2.5miles USCG Boat Basin – Sabine Pass area. Estimated dredge volume of 46,000CY. Will require dredging shallower depths and under a Boat House structure. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |