Similar Projects
Jan Drive and Genevieve Avenue Drainage Improvements
Infrastructure
Bidding
Callaway, FL 32404

Cherry Street Resurfacing, Sidewalks and Drainage Improvements
Infrastructure
Bidding
Callaway, FL

City Of Lynn Haven Push Button Maintenance, Repair and Minor Construction Contract
Post-Bid
Lynn Haven, FL 32444

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Callaway Point Drainage Improvement Project
Results
Callaway, FL 32404

Hombre Circle Culvert Improvements and Cleaning
Results
Panama City, FL 32407

7th Street Drainage Improvements
Infrastructure
Bidding
Lynn Haven, FL

KCS NASA Causeway Shoreline Repairs
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

City Hall (Old) and Library Demolition
- 17,900 SF
Results
Less than $134,040 est. value
Lynn Haven, FL 32444

Mexico Beach 15th Street Box Culvert Wingwall Repair
Infrastructure
Post-Bid
Mexico Beach, FL

Military Point Advanced Wastewater Treatment Plant Reject Pond Liner Replacement
Infrastructure
Results
Lower Grand Lagoon, FL 32408

19th Street and Montana Avenue Drainage Improvements
Infrastructure
Post-Bid
Lynn Haven, FL 32444

FEMA Pipe Repairs Phase I and Phase II
Infrastructure
Results
$994,539 est. value
FL

Indiana Avenue Drainage Improvements
Infrastructure
Post-Bid
Lynn Haven, FL 32444

Add Turn Lane(s)/Milling and Resurfacing/Traffic Signals/Drainage Improvements - SR 75 (US 231)
Infrastructure
Results
$1,663,467 est. value
FL

Last Updated 03/18/2022 09:01 AM
Project Title

Stormwater Flume Repair

Physical Address View project details and contacts
City, State (County) Panama City, FL   (Bay County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of work task items shall include: - Remove excess material/debris from each flume downstream erosion area and return downstream area to Pre-Hurricane Sally condition. - Fill, replace, compact, material in/around each flume to re-establish grade and drainage to Pre-Hurricane Sally condition

Details

Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents