Similar Projects
Meadow River Trail FEMA Remediation Project
New Construction, Infrastructure
Post-Bid
Lewisburg, WV

Wheeling Suspension Bridge
Results
Wheeling, WV 26003

Cheat River Bridge
Results
WV

Lick Creek Bridge
Results
WV

Trout Run Bridge
Results
WV

Treated Pine Bridge Lumber or Equal
New Construction
Results
Lewisburg, WV

Bluestone Bridge Repair 3010S
Renovation
Results
Charleston, WV

LT Darwin K Kyle Mem Bridge
New Construction
Results
WV

Guyan Creek Bridge
New Construction
Results
WV

Bridge Shotcrete Repair of Bridges 3018S and 3087
Renovation
Results
Charleston, WV

Fourth Street Beam
New Construction
Results
WV

Crawford Bottom Bridge
New Construction
Results
WV

Barnes Run Bridge
New Construction
Results
WV

WV State Police SGT Harold E Dailey
New Construction
Results
WV

Sam Black - Rusty Bridge
Infrastructure
Results
WV

Last Updated 10/25/2022 12:33 PM
Project Title

Construction-BR 6.5 South End Partial Replacement Timber

Physical Address View project details and contacts
City, State (County) Moorefield, WV 26836   (Hardy County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $1,779,693 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Construction-BR 6.5 South End Partial Replacement Timber PURPOSE AND SCOPE: The West Virginia Purchasing Division is so2022-08-18 CRFQ 13:30liciting bids on behalf of the WV Division of Multimodal Transportation Facilities to establish a contract for the following: Partial replacement of timber members on south end of BR 6.5. The Vendor shall furnish all materials, labor, and equipment necessary to complete all Construction Services. The Vendor shall furnish any incidental work, materials, labor, and equipment that are necessary to complete the Construction Services, even if such incidental work is not explicitly included in the Project Plans

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents