Similar Projects
Globeville Branch Library Construction
New Construction
Conception
$12,000,000 est. value
Denver, CO 80238

Hampden Branch Library Expansion
Renovation
Conception
$3,440,000 est. value
Denver, CO 80231

Clifton Capital Project
New Construction - 21,000 SF
Design
$6,000,000 est. value
Grand Junction, CO

Owner`s Representative Services - Three Building Projects
New Construction, Renovation
Post-Bid
Less than $8,500,000 est. value
Greeley, CO

Pikes Peak Library District Datacenter Colocation
New Construction
Post-Bid
Colorado Springs, CO

Owner's Representative - Mesa County Public Library District
Results
Grand Junction, CO 81501

Construction Manager and General Contractor Services
Renovation
Results
Pueblo, CO 81004

Gol! Gear Library General Contractor
Construction
Leadville, CO

Manitou Springs Library Construction
Construction
$173,756 est. value
Manitou Springs, CO 80829

Westwood Branch Library Construction
New Construction
Conception
$13,880,000 est. value
Denver, CO 80238

North Boulder Library
New Construction - 10,718 SF
Results
Less than $8,000,000 est. value
Boulder, CO 80304

Poudre River Public Library
New Construction
Construction
Fort Collins, CO

Children's Services Feature Exhibit
Results
$75,000 est. value
Pueblo, CO 81004

Main Library Interior Remodel and Entrance Addition
Renovation, Addition
Results
Less than $900,000 est. value
Frisco, CO 80443

Old Town Library Refresh
Renovation
Results
Fort Collins, CO 80524

Last Updated 01/14/2022 02:21 PM
Project Title

Blair Caldwell Branch Library Renovation

Physical Address View project details and contacts
City, State (County) Denver, CO 80205   (Denver County)
Category(s) Government/Public
Sub-Category(s) Library - Public
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,800,000 to $2,200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The renovation will include interior updates to staff and public spaces on the first and second floors. The scope includes improving HVAC and temperature controls; replacing rooftop HVAC units; redesigning book return to alternate interior space; updating and refreshing restrooms; improving surveillance and access control; updating lighting; updating the conference and community rooms; refreshing the children area; updating staff workroom, break room and office for better efficiency and better lighting; new arrangements for public access computers and access for mobile device use; providing new interior furniture and fixtures; complying with current ADA requirements; providing new way finding, digital signage and code required signage. Elevate Denver is a 10-year, $937 million general obligation bond program approved by voters in 2017, that will enhance the City and County of Denver by providing critical improvements to the City infrastructure improving our roads, sidewalks, parks, recreation centers, libraries, cultural centers, public-owned buildings and safety facilities.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents