Similar Projects
Storm Sewer and Inlet Cleaning
Results
Less than $318,617 est. value
TX

Phase 2 Storm Drain Replacement
Results
$7,800,000 to $9,400,000 est. value
University Park, TX

Best Practices for Installing an Underground Detention & Storm Drain System
Post-Bid
University Park, TX 75206

Caruth Park Underground Detention
Results
$3,011,895 est. value
University Park, TX 75205

SWWTP Stormwater Facilities Improvements
Results
$9,153,000 est. value
Dallas, TX 75201

Storm Sewer and Inlet Cleaning
Results
Less than $230,474 est. value
TX

Middleton Road Drainage Overflow Flume Reconstruction
Results
Less than $50,000 est. value
Cedar Hill, TX 75104

Dickey Road Storm Drain Improvements
Results
Less than $2,290,000 est. value
Grand Prairie, TX 75051

Annual Storm and Wastewater Systems Cleaning, Inspection and Reporting Contract
Term Contract
Results
$750,000 est. value
Irving, TX 75060

Timberview Drive Drainage Improvements
Results
$487,000 est. value
Irving, TX 75060

2020 Miscellaneous Neighborhood Drainage Improvements Phase II
Results
$588,489 est. value
Irving, TX

Storm Drain
Post-Bid
TX

Silverado Phase 7 Water, Sanitary Sewer and Storm Drainage Improvements
Results
Dallas, TX

Delaware Creek Channel Repair at Pioneer
Results
$334,590 est. value
Irving, TX

Storm Drainage Improvements at Various Locations Phase A
Post-Bid
Dallas, TX 75201

Last Updated 08/04/2020 12:15 PM
Project Title

Rehabilitate Landside Storm Sewer

Physical Address View project details and contacts
City, State (County) Dallas, TX 75261   (Dallas County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,910,781
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Rehabilitation of storm sewer and collapsed soils, including removal of existing RCP and replacing with PVC, new storm sewer structures, excavation and backfill. Construction will be outside the Airport’s Air Operations Area (AOA).

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents