Similar Projects
Roofing Supplies
Term Contract
Sub-Bidding
Columbia, SC 29201

Replace Metal and Flat Membrane Roofs at Federal Correctional Institution (FCI) Estill
Renovation
Sub-Bidding
$10,000,000 CJ est. value
Estill, SC 29918

LSCOG Roof Replacement
Alteration
Post-Bid
Aiken, SC 29801

Uofsc Wade Hampton Roof Replacement
Alteration
Post-Bid
$275,000 to $375,000 est. value
Columbia, SC

Pickens and Anderson Hall Roof Replacement
Results
$900,000 to $990,000 est. value
Pendleton, SC 29670

Monarch Elementary School Selective Roof Repairs
Results
Union, SC

Buildings B and E Roof Replacement - Brighton Place
Renovation
Construction
$56,875 CJ est. value
Charleston, SC 29407

Casualty Loss Funds Roof Replacement
Renovation
Sub-Bidding
$1,430,260 CJ est. value
Marion, SC 29571

Crawford Zimmerman Roof Replacement
Alteration
Post-Bid
$200,000 to $300,000 est. value
Orangeburg, SC 29115

Greenwood VOR Membrane Roof
Term Contract
Results
$100,000 to $250,000 est. value
Greenwood, SC

Town Hall Roof Replacement Lexington Municipal Complex
Renovation - 32,000 SF
Sub-Bidding
$60,000 CJ est. value
Lexington, SC 29072

Remove and Replace Lodge Roof at WEBB
Alteration
Post-Bid
Garnett, SC 29922

Ashley Oaks Apartments Re-Roofing
Alteration
Results
Charleston, SC 29407

Roof Replacement at HopeHealth - Hemingway
Renovation
Sub-Bidding
$250,000 CJ est. value
Hemingway, SC 29554

Chrysler Building Roof Replacement
Alteration
Post-Bid
Union, SC

Last Updated 07/05/2023 06:03 PM
Project Title

Material Recovery Facility Partial Roof Replacement

Physical Address View project details and contacts
City, State (County) North Augusta, SC 29841   (Aiken County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $90,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor shall furnish all labor, equipment and materials necessary to perform and complete all work. Remove 7,500 square feet of existing metal roof panels and three existing roof ventilation fans. Install new 7,500 square feet of black faced vinyl insulation and metal roof panels. Install Ash Gray color rain gutters and downspouts on the front and rear sides of the building. New roof panels shall be free of defects and shall be watertight. All existing roof panels and ventilation fans shall be disposed of by the City of North Augusta. The City of North Augusta reserves the right to waive any bid formalities and/or reject any or all bids. 1. Coordinate roofing installation so that during installation, no insulation, or other components of the building are not left exposed at the end of the workday, and subject to precipitation damage, or theft. 2. It shall be the contractor's responsibility to respond immediately to correction of roof leakage during construction. In the event of water intrusion during rain events, the contractor shall provide for repair or protection of building contents and interior. 3. Remove existing roofing material and ventilation fans down to the original decking substrate. All material removed will be disposed of by the City of North Augusta. 4. Install any metal framing that may be required to support the new roof material. 5. Install new black faced insulation/under lay system. The new insulation material shall be fully adhered to the existing deck. 6. All materials shall be installed per manufactures recommendations and their published installed manuals. 7. Install roof trim and flashing as required. 8. Install Ash Gray color gutters and downspouts in the rear and front sides of the building

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents