Alternate Aviation Ground Power Unit (AGPU) Generator
Post-Bid
Atlanta, GA

Purchase of Electrical Materials Six-Mo Contract
Term Contract
Post-Bid
Lawrenceville, GA 30046

Mechanical Electrical IDIQ
Results
$500,000 to $1,000,000 est. value
Robins Afb, GA 31098

Three Phase Pad Mounted Transformers
Results
Covington, GA 30014

Fire Station No.4 Solar Energy System
Post-Bid
Less than $99,000 est. value
Athens, GA 30606

Scott Candler Water Treatment Plant - Ozone Generators Design and Installation
Results
Doraville, GA 30360

Installation Project for Gen-Set at City Hall
Post-Bid
Bainbridge, GA 39817

Paulson Stadium LED Conversion
Results
Statesboro, GA 30460

Automatic Backup Generator
Post-Bid
Scotland, GA 31083

Plant Transformer
Results
Augusta, GA 30900

Electric Motor Repair and Replacement Service
Post-Bid
GA

30KW 120/208 3PH Generac Generator
Term Contract
Results
Less than $71,680 est. value
Sylvester, GA 31791

Cathodic Protection Ground Beds and One Cathodic Protection Rectifier
Post-Bid
Bainbridge, GA 39818

Deuce Lloyd Park Lighting
Results
Less than $12,900 est. value
Folkston, GA 31537

Install of 4 New Generac Generators
Post-Bid
GA

Reported 11/10/2021 12:00 AM
Project Title

Blythe Island Regional Park - Campground Electrical Upgrades Project 2022

Physical Address View project details and contacts
City, State (County) Brunswick, GA 31523   (Glynn County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of work: 1. Twenty existing sites, number 51-70, are to be completely rewired. The existing disconnect located on the backside of Bathhouse #2 shall be refed with new service line properly sized for a 200-amp panel that will refeed all circuits to bathhouse #2. 2. Each site to receive a new 50/30 Amp duel pedestal. 3. Sites will be installed jointly on one each 100 Amp breaker (i.e. Wire ran from each 100- amp breaker will serve two sites). 4. Wire shall be sized accordingly as per load and distance to service. 5. The service main shall be 1200 amp and shall consist of two each 600 Amp panels with 20 circuits each and ten 100 amp breakers evenly divided between the two 600 amp panels. 6. There is no preference on wire type provided it is sized adequately. All wire runs must be run fully inside schedule 40 conduit. 7. Panels must be covered with a sheltered roof. 8. A 6’ high chain link pen with 4’ gate(s) and top section shall be installed around the Electrical panel marquee for security and protection. See plans for details and location. The fence posts shall be inside of the fabric for these installations 9. The contractor will be responsible for trenching and conduit for Georgia Power to move transformer location and for all power supply lines to the individual camp sites. 10. All site work must be installed and trenches covered prior to Georgia Power relocation the transformer. 11. The contractor shall repair damages to any other utilities or materials damaged via construction to meet all applicable codes. 12. Electrical Meter and Panel Installation: Provide and install Field Fabricated Supports for Meter and Panel. Supports Shall Be 3”X3”X1/4” Thick Angle Iron Frames, Min of 2 Down Legs per Meter and Panel. Provide Additional Legs and Cross Braces If Required to Stabilize the meter and panel. Hot Dip Galvanize Completed Frames Prior to Installation. All Required Hardware Including All Nuts, Bolts, Washers, Etc., Shall Be Galvanized or Stainless Steel. Field Coordinate Exact Location with Owner. 13. Ten lots, numbers 41-50 will each receive new 50/30 amp pedestals. 14. Lots #41-50 will be serviced from Bath House #1 electrical panel. 15. Sites will be installed jointly on one each 100-amp breaker. (i.e. Wire ran from each 100-amp breaker will serve two sites). 16. Wire shall be sized accordingly as per load and distance to service. 17. All lines shall be run in conduit buried in trenches. 18. The contractor shall repair damages to any other utilities or materials damaged via construction to meet all applicable codes.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents