Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

George Washington Carver Museum Cultural and Genealogy Center Phase 2A Site Utilities
Renovation, Addition, Build-Out, Infrastructure
Design
$5,100,000 est. value
Austin, TX 78702

Parmer Village Multi-Family Apartment - Building 1 and Sitework
New Construction
Post-Bid
Austin, TX 78753

Water, Wastewater, Drainage and Paving Improvements for Bryson Phase 5 Section 1 and Bryson Phase 6, Public Improvement Construction Plans
Post-Bid
Leander, TX

Redevelopment of 1215 Red River and 606 East 12th Streets
Results
Austin, TX 78701

183A Phase III Project - Construction Engineering & Inspection Services
Results
Less than $180,000,000 est. value
Austin, TX 78705

QuikTrip #4190 / Manor
New Construction, Infrastructure - 4,993 SF
Pending Verification
$475,000 CJ est. value
Manor, TX 78653

Pflugerville Water Pipeline Project
New Construction, Infrastructure
Conception
$86,000,000 est. value
Pflugerville, TX

Ski Slopes Drive Waterline Replacement
Post-Bid
Austin, TX

Apache Shores Improvement Red Fox Waterline 1
Results
$495,000 est. value
Austin, TX 73301

SKI Slopes Drive Waterline Replacement
Post-Bid
Austin, TX 78733

Lakeway Highlands Phase 2 Section 8
Results
Lakeway, TX

Vine Creek Subdivision Improvements - Phases 6 and 7
Renovation
Post-Bid
Pflugerville, TX 78660

Bella Fortuna Phase 2A
Results
Less than $606,814 est. value
Austin, TX 78747

Last Updated 08/17/2022 03:02 PM
Project Title

Proposition B - 2021 Bond - City of West Lake Hills

Physical Address View project details and contacts
City, State (County) West Lake Hills, TX 78746   (Travis County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Obtained from a credible source, Awaiting verification, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $16,920,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The 2021 bond proposition B calls for road and drainage improvements. As of August 17, 2022, one design engineer was hired td design all the projects in this bond. No firm timeline has been established for the construction. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents