Similar Projects
Fence Replacement
Bidding
Westland, MI

Fence Replacement
Bidding
Westland, MI

Michigan State Police Grant - Bid Package 22
Post-Bid
Plymouth, MI

Fencing Maintenance and Repair
Post-Bid
Canton Township, MI

Maplewood Center and Manor Park Fencing
Results
Less than $37,452 est. value
Garden City, MI

Dearborn Shutoff Gates and Overflow Structure
Results
Dearborn, MI

Fencing for DPSCD Schools
Post-Bid
Detroit, MI

Perimeter Fencing
Results
Livonia, MI 48154

Parks Split Rail Fence Remove and Replace
Post-Bid
Wayne, MI

Replenishment of Erosion Controal Blankets and Fencing
Term Contract
Results
Less than $2,010 est. value
Romulus, MI 48174

Installation of Chain Link Fence (Lincoln Hall of Justice)
Post-Bid
Detroit, MI 48207

Baseball Diamond Fence Removal and Replacement
Results
Less than $106,820 est. value
Dearborn, MI 48120

Fencing Services and Material
Post-Bid
Dearborn Heights, MI 48125

Hemlock Park Fence Replacement
Results
Less than $4,950 est. value
Dearborn, MI 48126

Fence Supplies & Repairs
Post-Bid
Wayne, MI

Last Updated 07/29/2020 11:43 PM
Project Title

Main Gate Replacement

Physical Address View project details and contacts
City, State (County) Dearborn, MI 48126   (Wayne County)
Category(s) Single Trades
Sub-Category(s) Fencing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Upgrades to the main gate operator located at the DPW Yard located at 2951 Greenfield. This upgrade is to eliminate the after-hour faults where the gate won’t open or close and to upgrade the safety devices. Scope of Work 1.Remove current operator and install one new Lifmaster SL595UL Slide gate operator with leading edge photo eye reflective target, and rear bump edge on gate in compliance with UL325 Safety Standard. 2.All conduits which are protruding out of new operator control cabinet must be rigid PVC coated conduit. 3.Re-connect to existing power supply 4.The new operator must remain operational with all current push button remotes. 5.Relocate key switch post 6 feet away from gate with new weather proof cover. 6.Wires for key switch to be in rigid PVC coated conduit, and post set in concrete a minimum of 42” below grade. 7.Remove existing fence wire and install new fence wire the full width of gate using 9 gauge galvanized fencing approximately 40’ wide. 8.Replace signs and visibility strips on gate portion

Details

Division 32 - Exterior Improvements, Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents