Similar Projects
Insertion Valve Installation
Bidding
West Springfield, MA

Furnishing of Water Meters and Appurtenances on an As Needed Basis
Term Contract
Bidding
Agawam, MA

Purchase of Small Water Meters
Term Contract
Post-Bid
Springfield, MA 01101

Ductile Iron Pipe of Various Diameters
Post-Bid
Agawam, MA

Necessary Repairs to the Main Condenser Water Loop for Chilled Water System
Results
Less than $60,000 est. value
Springfield, MA 01103

Furnishing of Water Materials, Such as Ductile Iron Pipe, Fittings, Fire Hydrants, Valves, Service Brass and Appurtenances on an as Needed Basis
Results
Agawam, MA 01001

Construction of Large Water Meter Installation
Term Contract
Post-Bid
Chicopee, MA 01013

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Purchase Water Meters
Term Contract
Post-Bid
Chicopee, MA 01013

Maple Street Water Main Improvement Project
Results
Less than $650,000 est. value
East Longmeadow, MA 01028

Furnishing and Delivery of Stainless Steel Pipes and Fittings
Post-Bid
Westfield, MA

Water Service Boxes and Water Valve Boxes
Term Contract
Results
$62,416 est. value
Springfield, MA 01101

Water Infrastructure Improvements
Post-Bid
$1,560,000 est. value
Springfield, MA

Phase I Water Replacement Project
Results
Less than $1,500,000 est. value
Holyoke, MA

Ductile Iron Pipe of Various Diameter
Post-Bid
Agawam, MA

Last Updated 12/11/2020 08:48 AM
Project Title

Sykes Street Water Main

Physical Address View project details and contacts
City, State (County) Bondsville, MA   (Hampden County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,700,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of furnishing and installing approximately 5,100 linear feet of new 12-inch diameter ductile iron water main on Sykes Street (Route 181) and Fuller Road and all associated valves, fittings and appurtenances, including crossing the Ware River. This work also includes a new below ground vault for a pressure reducing valve at a new interconnection between the Bondsville Water District and the Three Rivers Water District. The Work includes installation of water services (as shown on the Contract Drawings) from the new water main to a new water curb stop. Final restoration shall include permanent trench pavement and loaming and seeding. Appendix C includes a locus map of the project area.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents